WA1005-CS110913 Page 1 of 2 George Marshall - RE: Confirmation of Tie-in From:   Jessica Brown <JLB@freese.com> To:   George Marshall <gmarshall@coppelltx.gov> Date:   9/13/2011 12:08 PM Subject:   RE: Confirmation of Tie-in CC:   Jessica Vassar <jbv@freese.com>, Michael Garza <MGARZA@coppelltx.gov>   George,   We loaded in the 0.8 MGD from the QT/Dividend development and started to add flow from the proposed Cypress Waters development.  Of the options you are proposing below, the best of the three locations is Option C.  There is surcharging in this line from the point of tie-in down to Beltline/Southwestern.  The largest amount of surcharging occurs in the manholes south of Wrangler just north of where the 12ā€ line ties in (that runs east/west just south of Wrangler).  There are no overflows, but the surcharging gets within 3’ of the rim of the manhole (using a peaking factor of 4.0 for the rest of the system).   The amount of flow that can be accommodated from Cypress Waters with the 0.8 MGD from QT/Dividend is 0.25 MGD with the flow conditions mentioned above, also with tying in at Option C.  Let me know if you need additional information or if we need to look further at the other tie-in locations, but I know that the capacity available at the other two tie-in locations is reduced from what I’m showing above.   Jessica L. Brown, P.E. Associate Freese and Nichols, Inc. (817) 735-7406   From: George Marshall [mailto:gmarshall@coppelltx.gov] Sent: Tuesday, September 13, 2011 11:42 AM To: Jessica Brown Cc: Jessica Vassar; Michael Garza Subject: Re: Confirmation of Tie-in   Jessica,   The plans submitted by Cypress Waters shows a tie in at Location #2.  Since then they should have been working with the QT/Dividend engineer to combine their tie in.  I believe they are thinking about 3 scenarios: A) location #2, B) At the manhole at the pipe change from 12" to 15", or C) Along the 12" after the ox culvert shifts outside the pavement. At this point we have not directed anyone as to the exact location other than telling them that the ex. 8" stub is not sufficient.   Thank You, George     George Marshall, PE City of Coppell Engineering 972-304-3562 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E6F47B2City...12/19/2011 Page 2 of 2 >>> Jessica Brown <JLB@freese.com> 9/13/2011 11:26 AM >>> George,   I want to confirm that we are talking about Cypress Waters and the QT property both tying in at Location #2 on the attached plan and not at Location #2 (which is Lakeshore Drive).  Our recommendation for Cypress Waters was Location #1, but you had mentioned the Northlake driveway as being the tie-in location, which is Location #2.   Jessica     Jessica L. Brown, P.E. Associate   Freese and Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, TX 76109 817-735-7406 office 817-735-7492 fax   www.freese.com       Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E6F47B2City...12/19/2011 îíêèô   ÷