Loading...
WA1005-CS111121 Page 1 of 2 George Marshall - Re: Coppell Impact Fees - Cost Estimates From:   Brandon Huxford <bjh@freese.com> To:   "gmarshall@coppelltx.gov" <gmarshall@coppelltx.gov> Date:   11/21/2011 1:34 PM Subject:   Re: Coppell Impact Fees - Cost Estimates CC:   Tricia Hatley <thh@freese.com> Attachments:ST0502A-EM050131-Freeport Pkwy Ruby to Sandy Lake.pdf; ST0502B-EM050131-     Freeport Pkwy Sandy Lake to 121.pdf; comments from George-10-5-11.xls   George,   Along the same lines as the previous email, I just wanted to verify the cost for Freeport Parkway - Sandy Lake to SH 121 as well as Freeport Parkway - Ruby to Sandy Lake.  In a previous markup the costs were stated to have been:   Freeport Parkway (Sandy Lake to SH 121) – 20% of 8,370,421 = $1,674,084 Freeport Parkway (Sandy Lake to Ruby) – 20% of 5,150,000 = $1,030,000   On, the other hand the estimates are shown to be:   Freeport Parkway (Sandy Lake to SH 121) – Total City Cost - $1,140,436 Freeport Parkway (Sandy Lake to Ruby) – Total City Cost - $1,627,609   Have the estimates been revised since 2005?  If so, could we get a copy of the revised estimate?   Thanks in advance,   Brandon Huxford, E.I.T. Transportation/Infrastructure   Freese and Nichols, Inc. 1701 N. Market St. Suite 500 Dallas, Texas 75202 214-217-2335 214-217-2201 fax   www.freese.com       From: George Marshall [mailto:gmarshall@coppelltx.gov] Sent: Monday, October 31, 2011 4:17 PM To: Brandon Huxford Cc: Tricia Hatley Subject: Re: Coppell Impact Fees - Cost Estimates file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4ECA5383City...12/19/2011 Page 2 of 2   Attached are the estimates for Freeport projects.  I will need to get back to you on the Sandy Lake projects.   Thank You, George   George Marshall, PE City of Coppell Engineering 972-304-3562 >>> Brandon Huxford <bjh@freese.com> 10/31/2011 2:35 PM >>> George,   We are starting to compile data for the Roadway Impact Fees, would you happen to have cost estimates for the projects you provided cost feedback on a couple weeks ago?   -Sandy Lake Road (Coppell Rd to Denton Tap Road) - $8,500,000           -Freeport Pkwy (SH 121 to Sandy Lake Rd) - $1,674,084           -Freeport Pkwy (Ruby Rd to Sandy Lake Rd) - $1,030,000               Thanks in advance.   Brandon Huxford, E.I.T. Transportation/Infrastructure   Freese and Nichols, Inc. 1701 N. Market St. Suite 500 Dallas, Texas 75202 214-217-2335 214-217-2201 fax   www.freese.com     Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4ECA5383City...12/19/2011 Page 1 of 1 George Marshall - Re: Coppell Impact Fees - Cost Estimates From:   Rhonda Adloo Subject:   Re: Coppell Impact Fees - Cost Estimates   >>> Michael Garza 11/21/2011 2:12 PM >>> Brandon, This is the correct cost:   Freeport Parkway (Sandy Lake to SH 121) – 20% of 8,370,421 = $1,674,000 Freeport Parkway (Sandy Lake to Ruby) – 20% of 5,150,000 = $1,030,000 thanks, Mike   about:blank12/19/2011 CIP Projects Status Project #RoadwayFromToStatusCostCOST w/ FINANCINGNotes 1Sandy Lake RoadCity Limit (west)Coppell RoadCompleted$ 3,800,263.33 Estimate - $8,500,000 (split into 2 phases) 2Sandy Lake RoadCoppell RoadDenton Tap RoadCIP 5Royal LaneSandy Lake RoadExtend SouthCompletedPart of ST99-02 W. Sandy Lake Road +/-1350' Meeting notes say complete - don't have estimate Estimate - $8,370,421 6Freeport PkwySH 121Sandy Lake RoadCIP(City Responsible for 20%) Estimate - $5,150,000 7Freeport PkwyRuby RoadSandy Lake RoadCIP(City Responsible for 20%) 9Bethel RoadCity Limit (west)Freeport PkwyCompleted$ 7,280,320.90 added one southbound lane - Nothing done or any plans in the works 10Royal LaneIH 635Bethel Road?? 11Southwestern BlvdCoppell RoadDenton Tap RoadCompleted$ 1,204,348.91 added one southbound lane - is cost provided for one lane? - Yes, actual construction cost. 13Macarthur BlvdBethel School RoadBelt Line RoadCompleted$ 325,393.65 ?'s What about added capacity for Bethel Road at Denton Tap? We are adding traffic signal to MacArthur & Deforest along with additional turn lane on westbound Deforest. Why are you not including any of the Coppell Road projects? Page 1 of 1 George Marshall - Sandy Lake From:   "Chris B. Seely" <cseely@tnp-online.com> To:   <gmarshall@coppelltx.gov> Date:   11/21/2011 5:47 PM Subject:   Sandy Lake Attachments:   B1 - North Coppell to South Coppell.pdf   George: Attached is the OPC for the section between North Coppell and South Coppell.  I haven’t been able to locate the one for the section from South Coppell to Denton Tap.  I will keep looking and have something for you tomorrow morning. Chris   Chris Seely, P.E. (TX) Project Manager TEAGUE NALL AND PERKINS, INC . 12160 North Abrams Road Suite 508 Dallas, Texas  75243 214.461.9867 phone 214.461.9864 fax cseely@tnp-online.com www.tnp-online.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4ECA8EAACit...12/19/2011 TEAGUE NALL AND PERKINS, INC. OPINION OF PROBABLE COST West Sandy Lake Road - Coppell Road North to Coppell Road South Construction Standard: City of Coppell Construction Date: 2011 ITEM NO.DESCRIPTION OF ITEMSQUANTITYUNITUNIT COSTTOTAL PAVING IMPROVEMENTS 1RIGHT-OF-WAY PREPARATION$2,500.00$50,000 20STA 2MOBILIZATION1LS$150,000.00$150,000 3CONCRETE REMOVAL$7.00$16,450 2350SY 4HMAC REMOVAL5400SY$7.00$37,800 5UNCLASSIFIED STREET EXCAVATION$12.00$240,000 20000CY 68" CEMENT STABLIZED SUBGRADE13600SY$2.50$34,000 7CEMENT STABLIZATION (42#/SY)$115.00$33,350 290TON 88" REINFORCED CONCRETE PAVEMENT13000SY$40.00$520,000 98" ENHANCED PAVEMENT$75.00$15,000 200SY 10REMOVE 6" HMAC PAVEMENT TRANSITION1100SY$7.00$7,700 11STEPPED BLOCK RETAINING WALLS$50.00$75,000 1500SF 12PVC CONDUIT2000LF$8.00$16,000 13PAVEMENT MARKINGS AND SIGNAGE$15,000.00$15,000 1LS 14BARRICADES, SIGNS & TRAFFIC CONTROL1LS$75,000.00$75,000 15EROSION CONTROL$25,000.00$25,000 1LS 168' BIKE PATH13000SF$6.00$78,000 175' SIDEWALK$5.00$45,750 9150SF 18BARRIER FREE RAMP6EA$1,000.00$6,000 19STREET LIGHT FOUNDATION$2,000.00$40,000 20EA 20RESTORE PARKWAYS20STA$2,500.00$50,000 21RESTORE/RECONSTRUCT EXISTING IRRIGATION$25,000.00$25,000 1LS SUBTOTAL PAVING $1,555,050 BRIDGE 1DEMO EXISTING BRIDGE$50,000.00$50,000 1EA 2FLEXIBLE BASE$55.00$15,400 280CY 318" DRILL PIERS152LF$100.00$15,200 430" DRILLED PIERS$150.00$56,250 375LF 5CONCRETE ABUTMENTS105CY$525.00$55,125 6CONCRETE BENTS$525.00$43,575 83CY 78" THICK BRIDGE DECK13004SF$18.00$234,072 8EXPOXY WATERPROOFING$2.50$9,125 3650SF 9CONCRETE SURFACE TREATMENT12716SF$2.50$31,790 10TYPE C PRESTRESSED CONCRETE GIRDERS$110.00$173,910 1581LF 11CONCRETRE RIP-RAP175CY$265.00$46,375 12STRUCTURAL STEEL - ARMOR JOINT$4.00$25,600 6400LB 13SPECIAL TRAFFIC / PEDESTRIAN RAIL193LF$155.00$29,915 14SPECIAL TRAFFIC / BICYCLE RAIL$210.00$81,060 386LF 15CONCRETE APPROACH SLABS144CY$450.00$64,800 16METAL BEAM GUARD FENCE$30.00$12,000 400LF 17ELECTRICAL CONDUIT880LF$8.00$7,040 18LIGHT STANDARDS$2,000.00$8,000 4EA 19ENHANCED PAVEMENT2175SF$8.00$17,400 SUBTOTAL BRIDGE $976,637 WATER 1RELOCATE / ADJUST 24" WATER LINE$150.00$22,500 150LF 2RELOCATE MISC. WATER (HYDRANTS, VALVES, ETC)1LS$25,000.00$25,000 SUBTOTAL WATER RELOCATION $47,500 DRAINAGE 1DEMO RCP STORM DRAIN$10.00$1,000 100LF 2DEMO HEADWALLS2EA$1,000.00$2,000 3CONNECT TO EXISTING RCP$400.00$800 2EA 430" CLASS III RCP150LF$90.00$13,500 524" CLASS III RCP$85.00$51,000 600LF 618" CLASS III RCP475LF$75.00$35,625 710' RECESSED CURB INLET$3,000.00$24,000 8EA 84' SQUARE MANHOLE2EA$5,000.00$10,000 9TRENCH SAFETY$2.00$2,450 1225LF SUBTOTAL DRAINAGE $140,375 LANDSCAPING / IRRIGATION WEST SANDY LAKE ROAD 1LS 1 $200,000.00$200,000 404 MITIGATION 1LS 2$50,000.00$50,000 SUBTOTAL LANDSCAPING $250,000 PROJECT SUBTOTAL $2,969,562 20% CONTINGENCY $593,912 PROJECT TOTAL $3,563,500 Notes: 1) Quantity differences from City Cost Opinion attributed to the additional width of road section necessary for 4' wide on-street bike lanes. 2) Unit cost differences from City Cost Opinion attributed to "TxDOT Factor", overall scale of project being bid, and a construction date 3-years later. (TxDOT Factor = approximately 15-20% more to construct similar projects to TxDOT standards based on recent bids.) Page 1 of 1 George Marshall - SLR - North Coppell to Denton Tap From:   "Chris B. Seely" <cseely@tnp-online.com> To:   <gmarshall@coppelltx.gov> Date:   11/21/2011 5:52 PM Subject:   SLR - North Coppell to Denton Tap Attachments:   PH2-OPC-4-23-04.xls   George: Attached is a spreadsheet that covers from North Coppell to Denton Tap (both phases).  I am sending it to you in Excel so that unit prices can be adjusted since it was created in 2004.  I can update the prices if you would like. Chris   Chris Seely, P.E. (TX) Project Manager TEAGUE NALL AND PERKINS, INC . 12160 North Abrams Road Suite 508 Dallas, Texas  75243 214.461.9867 phone 214.461.9864 fax cseely@tnp-online.com www.tnp-online.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4ECA8FD5Cit...12/19/2011 OPINION OF PROBABLE CONSTRUCTION COST SCHEMATIC DESIGN PHASE TEAGUE NALL AND PERKINS, INC. CONSULTING ENGINEERS CLIENT: CITY OF COPPELL DESCRIPTION: WEST SANDY LAKE ROAD - PHASE II (COPPELL ROAD NORTH TO DENTON TAP ROAD) DATE: APRIL 2004 ITEM NO.DESCRIPTION OF ITEMSQUANTITYUNITUNIT COSTTOTAL PAVING IMPROVEMENTS 1RIGHT-OF-WAY PREPARATION7820STA$25.00$195,500 2MOBILIZATION1LS$200,000.00$200,000 3CONCRETE REMOVAL5000SY$5.00$25,000 4HMAC REMOVAL17100SY$5.00$85,500 5UNCLASSIFIED STREET EXCAVATION50000CY$6.00$300,000 68" CEMENT STABLIZED SUBGRADE44000SY$1.85$81,400 7CEMENT STABLIZATION (42#/SY)924TON$85.00$78,540 88" REINFORCED CONCRETE PAVEMENT42400SY$27.50$1,166,000 98" ENHANCED PAVEMENT1500SY$100.00$150,000 10REMOVE 6" HMAC PAVEMENT TRANSITION1450SY$5.00$7,250 11STEPPED BLOCK RETAINING WALLS750SF$25.00$18,750 126" REINFORCED CONCRETE DRIVEWAY800SY$30.00$24,000 13PVC CONDUIT5800LF$10.00$58,000 14PAVEMENT MARKINGS AND SIGNAGE1LS$80,000.00$80,000 15BARRICADES, SIGNS & TRAFFIC CONTROL1LS$200,000.00$200,000 16EROSION CONTROL1LS$50,000.00$50,000 1710' BIKE PATH53100SF$3.50$185,850 185' SIDEWALK25650SF$3.00$76,950 19STREET LIGHT FOUNDATION60EA$2,000.00$120,000 20RESTORE PARKWAYS7820STA$20.00$156,400 21RESTORE/RECONSTRUCT EXISTING IRRIGATION1LS$30,000.00$30,000 SUBTOTAL PAVING$3,289,140 BRIDGE IMPROVEMENTS 1DEMO EXISTING BRIDGE1EA$35,000.00$35,000 2FLEXIBLE BASE280CY$50.00$14,000 318" DRILL PIERS152LF$60.00$9,120 430" DRILLED PIERS375LF$90.00$33,750 5CONCRETE ABUTMENTS105CY$550.00$57,750 6CONCRETE BENTS83CY$600.00$49,800 78" THICK BRIDGE DECK13004SF$12.00$156,048 8EXPOXY WATERPROOFING3650SF$1.00$3,650 9CONCRETE SURFACE TREATMENT12716SF$1.50$19,074 10TYPE C PRESTRESSED CONCRETE GIRDERS1581LF$70.00$110,670 11CONCRETRE RIP-RAP175CY$250.00$43,750 12STRUCTURAL STEEL - ARMOR JOINT6400LB$4.00$25,600 13SPECIAL TRAFFIC / PEDESTRIAN RAIL193LF$125.00$24,125 14SPECIAL TRAFFIC / BICYCLE RAIL386LF$140.00$54,040 15CONCRETE APPROACH SLABS144CY$250.00$36,000 16METAL BEAM GUARD FENCE400LF$25.00$10,000 17ELECTRICAL CONDUIT880LF$3.00$2,640 18LIGHT STANDARDS4EA$1,500.00$6,000 19ENHANCED PAVEMENT2175SF$5.00$10,875 SUBTOTAL BRIDGE $701,892 OPINION OF PROBABLE CONSTRUCTION COST SCHEMATIC DESIGN PHASE TEAGUE NALL AND PERKINS, INC. CONSULTING ENGINEERS CLIENT: CITY OF COPPELL DESCRIPTION: WEST SANDY LAKE ROAD - PHASE II (COPPELL ROAD NORTH TO DENTON TAP ROAD) DATE: APRIL 2004 ITEM NO.DESCRIPTION OF ITEMSQUANTITYUNITUNIT COSTTOTAL WATER IMPROVEMENTS 1RELOCATE / ADJUST 24" WATER LINE700LF$150.00$105,000 2RELOCATE MISC. WATER (HYDRANTS, VALVES, ETC)1LS$50,000.00$50,000 SUBTOTAL WATER $155,000 SANITARY SEWER IMPROVEMENTS 18" SS LINE230LF$100.00$23,000 2ADJUST MH & MISC.1LS$10,000.00$10,000 SUBTOTAL SANITARY SEWER $33,000 UTILITY ADJUSTMENTS 1RELOCATE TXU OVERHEAD TRASMISSION POLES4EA$10,000.00$40,000 SUBTOTAL UTILITY ADJUSTMENT$40,000 STORM DRAIN IMPROVEMENTS 1DEMO RCP STORM DRAIN849LF$7.50$6,368 2DEMO HEADWALLS6EA$500.00$3,000 3CONNECT TO EXISTING RCP7EA$400.00$2,800 4CONNECT TO EXISTING 10x8 RCB1EA$1,500.00$1,500 55'X3' RCB385LF$215.00$82,775 66'X3' RCB190LF$225.00$42,750 76'X4' RCB440LF$230.00$101,200 89'X6' RCB130LF$300.00$39,000 910'X8' RCB50LF$360.00$18,000 1048" CLASS III RCP240LF$100.00$24,000 1142" CLASS III RCP110LF$95.00$10,450 1239" CLASS III RCP85LF$90.00$7,650 1336" CLASS III RCP440LF$70.00$30,800 1433" CLASS III RCP275LF$65.00$17,875 1530" CLASS III RCP185LF$60.00$11,100 1627" CLASS III RCP50LF$55.00$2,750 1724" CLASS III RCP665LF$50.00$33,250 1821" CLASS III RCP455LF$45.00$20,475 1918" CLASS III RCP900LF$40.00$36,000 2010' RECESSED CURB INLET6EA$2,500.00$15,000 2112' RECESSED CURB INLET5EA$2,750.00$13,750 2214' RECESSED CURB INLET5EA$3,000.00$15,000 2320' RECESSED CURB INLET5EA$3,500.00$17,500 244' COMBINATION INLET1EA$2,500.00$2,500 256x6 DROP INLET1EA$5,000.00$5,000 266' SQUARE MANHOLE2EA$5,000.00$10,000 275' SQUARE MANHOLE1EA$4,000.00$4,000 284' SQUARE MANHOLE7EA$3,000.00$21,000 29TRENCH SAFETY4600LF$2.00$9,200 30WINGWALL FOR MBC 9x61EA$10,000.00$10,000 SUBTOTAL DRAINAGE$614,693 OPINION OF PROBABLE CONSTRUCTION COST SCHEMATIC DESIGN PHASE TEAGUE NALL AND PERKINS, INC. CONSULTING ENGINEERS CLIENT: CITY OF COPPELL DESCRIPTION: WEST SANDY LAKE ROAD - PHASE II (COPPELL ROAD NORTH TO DENTON TAP ROAD) DATE: APRIL 2004 ITEM NO.DESCRIPTION OF ITEMSQUANTITYUNITUNIT COSTTOTAL TRAFFIC SIGNAL IMPROVEMENT 1SIGNALIZATION FOR 2 INTERSECTIONS1LS$155,000.00$155,000 SUBTOTAL SIGNALIZATION$155,000 LANDSCAPING / IRRIGATION 1WEST SANDY LAKE ROAD1LS$500,000.00$500,000 2404 MITIGATION1LS$50,000.00$50,000 SUBTOTAL LANDSCAPING$550,000