Loading...
MA FY 0405-CS061108T H E C I T Y O F COPPELL T 1� a F x s� A S 1 November 8, 2006 Anthony Givens, Pres. Pavement Services Corporation 4000 Tarrant Main Euless TX 76039 Fax: 817 -540 -0740 RE: Annual Street & Alley Repair Project PROGRESS MEETING Dear Mr. Givens: A meeting on the progress of the referenced project has been scheduled for Friday, November 10, 2006 at 10:00 a.m. at Town Center, 255 Parkway Blvd. Check in with the Engineering Dept. receptionist upon arrival for meeting location details. If you have any questions prior to the scheduled meeting, feel free to contact me at (972) 304 -7090. Sincerely, 1 � �, Mx' We L�J Wm�� 1 Rick O'Dell Construction Inspector Office Phone: 972 - 304 -7090 Fax: 972 - 304 -3570 cc: Keith Marvin, P.E., Asst. City Engineer Tom Sullivan, Pavement Services 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673