Loading...
Bethel School/Harris-CS 920918 September 18, 1992 ~ ~ SIP 2 I 1~92 H.Matthe~ci,T.of~dinger,~ppeHInvestmen~jr. Southw~t, ~c. X[ ~''~' }~~ ~1 Jay S. Turner, ESQ. ~r S~: Pursuant to the Road Improvemenu ~truction and ~crow Agr~ment, S~tion 4.2, we have approv~ Draw ~3. Attach~ are mpies of lien waivers and documen~tion. R~onably good w~ther for the p~t w~k h~ allow~ for substantial progress on the projm. Half of the strut is now mn~ete the other half ~ being stabil~ ~th lime - the step before paving. Soil tesu and mncrete tesu, per ci~ r~uiremenu, have b~n ~mplet~ for pav~ ar~ by independent m~ultanu (Rone and R~ Engin~). HCH m~truction has had $3,~8.~ of primarily ci~ - r~u2~ changes. ~e additional store drain i~et (mentioned in l~t mont~ report) loo~ ~ke it ~11 ~ a change of less than $4,~ rather than the $7,~ e~t~ - this b favorable to the project. We ~n en~ion the proj~t mmpletion ~om t~ point, and we do not see an~hing that would ex~ the budget. If all moves fom~ard ~ e~ect~, we mn possibly look to a small reimbursement to the developer partner. Sin~rely, NA~N D. ~ER CONSUL~G ENGINEERS, ~C. Peter Sta~ PS/c~ Atmc~ent Three NorthPark/8800 N. Central Expwy./Suite 300/Dallas, Texas 75231/(214) 739-4741 ¢--, _--, z ~ ~ ",~ - -, ~ ( I' ',m ) ~ ~ .~.~. Z " 1~ ¢n ~ '.,.0 -'~ I ~1~ ~ ~ ~ ..,o.~.,i ~J J ~ < ~ /11 ~ ~.g6~ c ~ ~ E_NI ~ = ~ ~ ~ ~1 ~~< Pay Estimate No.: Rebcon, Inc. Project Name: Harris Street/Bethel School Road I868 W. Northwest Hwy Coppell Paving Projects Dallas, Tx 75220 Estimate Period: 7/21/92 - B/20/92 RI 19209 ~ ) I I I Previous) Work I I Completed I Completed Item) Description I Scheduled ) Unit ) Total I Work I This I Completedl This I Job No. I ) Quantity I Price ) I Units IEstimate) Quantity I Month ) To ~ate Earthwork Items 1 Unclassified Earth Work 1 LS $44,000.00 $44,000.00 0 0.5 0.5 $22,000.00 $22,000.00 Removal 2 Saw Cut 140 LF $3.30 $462.00 0 150 150 $495.00 $495.00 3 Removing RCP 80 LF $27.00 $2,160.00 0 BO 80 $2,160.00 $2,160.00 ( Remove Existing Headwal! 5 EA $125.00 $625.00 0 5 5 $625.00 $625.00 5 Remove Existing Paving 4560 SY $0.50 $2,280.00 0 2280 2280 $1,140.00 $1,140.00 6 Removing Existing Sidewalk I LS $2,000.00 $2,000.00 0 I I $2,000.00 $2,000.00 7 Relocate Exist Mail Boxes 4 EA $50.00 $200.00 0 4 4 $200.00 $200.00 Paving Items B 6" 3000psi Rein( Cone Pay 6900 SY $15.71 $108,39~.00 0 2000 2000 $31,420.00 g 4" 3600psi Var Alley Conc 70 SY $13.00 $910.00 0 0 0 $0.00 $0.00 10 Lime Stabilization 7500 SY $2.65 $19,875.00 0 3750 3750 $g,937.50 Sg,g37.50 11 Rein( Cone Sidewalk 31gO SF $2.00 $6,380.00 0 0 0 $0.00 $0.00 12 Wheelchair Ramp 5 EA $300.00 $1~500.00 0 0 0 $0.00 $0.00 13 Grass Crete ~00 SF $(.15 $3,735.00 0 0 0 $0.00 $0.00 Traffic Items 14 Traffic Control 0.3333 LS $22,000.00 $7,333.33 0 0.2 0.2 $4,400.00 $4,400.00 15 Metal Beam Barricade 57 LF $18.50 $1,054.50 0 0 0 $0.00 $0.00 16 Fire Hydrant Reflector 3 EA $10.00 $30.00 0 0 0 $0.00 $0.00 Page Total $200,94~.B~ $74,377.50 $74,377.50 BILLS PAID AFFIDAVIT BY CONTRACTOR THE STATE OF TEXAS > COUNTY OF DALLAS > BEFORE ME, the undersigned authority, on this day personally appeared R.E. Bursett , known to me to be the person whose name is subscribed hereto and who, after being by me duly sworn, upon oath, deposes and says: THAT this Affiant is one and the same as Rebcon~ Inc. Contractor in that one certain construction contract (the "Contract") by and between H.T. Ardinger & Son, In¢, , and the undersigned dated, and covering improvements to certain property more particularly described on Exhibit "A" attached hereto and made a part hereof Harris Str~t/B~thP] ~hnn] (the "Property"). That said improvements have been completed and that all terms of the Contract have been fully complied with; That all bills for labor performed or materials furnished in connection with the improvements provided for in the Contract have been fully paid and discharged; and That the Contract was fully executed prior to the placing of any materials on the above premises and pri~r 'to 'the performance of any labor pursuant to the Contract, and that there are now no unpaid claims of any nature against said improvements or the Property; That the foregoing affidavit is made to H.T. Ardin~er & Son, Inc.., for the purpose of inducing it to fund the remaining amounts due to the undersigned under the Contract, it being understood that full reliance is being placed upon the representations herein contained in funding such amounts. WITNESS MY HAND this 27 day o~-~ August _, 19 92. SUBSCRIBED AND SWORN TO BEFORE ME by R.E. Burgett .., on this the 27 day of~ August , 19 ~? , to certify which witness my hand and seal of office. [SEAr.] Notary l:mbl£¢ ~.n and for the State of Texas l~'~ - State of Texas { ~o~ ~mm Exo 03 2Z ~ oo 8o/z WAIVER OF LIEN THE STATE OF TEXAS > > COUNTY OF DALLAS > The undersigned contracted with H.T. Ardin~er & Son, Inc. , to furnish Improvements in connection with certain improvements to real property located in the City of Coppel~ , County of Dallas , and the State of , particularly Texas more described on Exhibit "A" attached hereto and made a part hereof for all Harri~ Street/Bethel School Road purposes (the "Property"), and owned by H.T. Ardin~er & Son, inc. , which improvements are described generally as follows: ImDrovements . In consideration of Six Thousand Nine Hundred Thirty Nine Sixty and 75/100 Dollars ($ 66,939.75 ) and other good and valuable consideration, the undersigned does hereby waive and release any mechanic's lien or materialman's lien or claims of lien that the undersigned has or may have against the Property and the improvements, which the undersigned has or hereafter_has on the Property on account of any labor performed or materials f nished or to be furnished or labor performed and materials furnished by the undersigned pursuant to the above mentioned contract, or any constitutional lien that the undersigned may have. SWORN TO BEFORE ME by . R, E. Burgett , SUBSCRIBED AND on this the 27 day of August , 19 92 , to certify which witness my hand and seal of office. [SEAL] Notary PubliC\in and fdr the State of Texas My Commission Expires: 3/21/96 00670/1 APPLICATION AND CERTIFICATE FOR PAYMENT TO (C~NNER~: H.T. Ardinger & Son, Inc. P~OJ~ZT: Bethel School/Harris Stre~PUCA~ON NO: 3 ~t~b~nto: Water, Sanitary Sewer & ..... [] OWNER Storm Drainage Improvemen~~uu TO: 8-25-92 [] ENGINEER ' FROM (CONTRACTOR): HC~I Construction, Inc.VIA (ENGINEER~: Nathan D. Maie~ ENGINEER'S [] CONTRACTOR CONTRACT ~OP~ Harris Street/Bethel School Road CONTRACT DATE: 5/28/92 [] CONTRACTOR'S APPUCATION FOR PAYMENT Apldicatioets made fe~ PaymenL asshown below, in coenecttonwith theComracL CMAN'GEORDER 1. O~IGINAE(X)NITACTSUM ................. S %14.438,08 ~. co~t~sumtouat~ ................. s ~/~,5/q,.f,i'z ~ ! /~ / ~'~'. 9~. . toTaucomeLen~touate ............... $ 92,275.~2 r^IMENT ............................. $. 76 ~ 313.81 ar~ tl,~ curmmt ~ sho,wn F,,~.'m ts now ~u~.__ __ ,,,~ State of:. Texas C°umtY °f: Dallas has progressed as the quai~ Work ~ ~ accordance with the Contract Documents, and the Contractor ~ entiUed to ,pa)m~mt of the ThisC ~l~ca~'not~e ,~t~ TheAMOUNTCERlqFIEDispayab~eonly. to the Contract°~ named he~e~ Issua~ ~, l~ymenC and acceptance of payment a~e wtmeu~ p~e~u~ce to A/vtOUNT CERTIFIED. any rights of the Owne ,efContractor unc~ this Contract. . WAZVBR OF LZBM THE STATE OF TEXAS · COUNTY OF DALLAS · The undersigned contracted with H.T. Ardinger & Son. Inc. , to furnish Sanitary Sewer. and StO~B Drainaae Improvements in connection with certain improvements to real property located in the city o£ CoRDell . , County of Denton , and the State T~X~s , more particularly described on Exhibit #i" attached hereto and mada a part hereof for all purposes (the "Property")w and owned by H.T. Ardin_~er & Son. which Improvements are described generally as follows: ~ Sanitary Sewer. and Stor~ Drainaae ImorovementS In consideration ct Six Thousand Seven H~dred Thir~-Three a Eiah~y Cents ~11ars (~' 6~733,80 ) and other go~ Bad valuable oonsideration~ ~e untersignK dHs h~reby valve and release any n~ohanio~s lien or ilteriallan~s lien or claims of lien ~at. the und~rsign~ has or Bay have against ~ ~ro~ty ~nd ~e i~prov~ents, which ~e ~ersi~ h~s o~ hereatter has on th~ ~ope~y on ao~t ct any la~r ~:to~et or ~ater/~ls hashed or to ~ rurnish~ or la~r ~rro~ed and materials furnished by ~e ~dersign~ pursuant to ~e a~ve nentioned ,.v.. . Contractor SUB~CRXBED AND SWORN TO BEFORE N~ byM.. Jeffrey Hicks~ V.P., HCH Constr.q~tion, Inc. on this tha 26th day of . August w 1992 to certify vhich witness my handand seal of office. [SEAL] n and for the State of Texas '~v. ........ ,v~ ,, ,j ...,~y,~;:.?~_'..~ xy co. lesion Expires: 9-~-9~ --"'?~,~%..'" 00670/1 BXLZ,~ PAXD ]t~XDAVXT ~¥ COI~i~CTOR THE STATE OF TEXAS COUNTY OF DALLAS BEFORE NE, the undersigned authority, on this day personally appeared M. Jeffrey Hicks, Vice PresidentI HCH Construction~ Inc. known to ~e"to be the person whose name lm subscribed hereto an~ who, after being by me duly sworn, upon oath, deposes and sayst THAT this Affiant is one and the same as .. M. Jeffrey H./cks, Vice President, HCH Construction~ Inc. Contractor in that one certain construction contract (the #Contract#) by and between H.T. Ardinger & Son, Inc. . , and the undersigned dated, and covering improvements to certain property more particularly described on Exhibit #A" attached hereto and made a part hereof Harris Street/Bethel SchOol (the #Property#) . That said improvements have been completed and that all tar~s of the Contract have been fully complied with; That all bills for labor perfo~ed or materials furnished in connection with the improvements provided for in the Contract have been fully paid and discharged! and That the Contract vas fully executed prior to the placing of any materials on the above pre~ises and prior to the performance of any labor pursuant to the Contract, and that there are now no unpaid claims of any nature against said improvements or the Property! That the foregoing affidavit la made to H.T. Ardinger & ,~on: Inc. ~ for the purpose of inducing it to fund the remaining amounts due to the undersigned under the Contract, it being understood that full reliance is being placed upon the representations herein contained in funding such a~ounta. this day of SUBSCRIBED AND SWORN ~O BEFORE NB bye.. Jeffrey Hicks, V.P., HCH Constrpction,Inc. on this the ~ day of August , 1992 to certify wh~tnesa my hand and'seal of OffiCe. ' ' " ~"-~'..'--,;-"..~? Nota~ ~lio In and for the State of Texas f f .:~.~i~ "% ~ . Ny Co, lesion l~ires~ 9-13-95 · .,. -- 00680/1 - 0 reed engineering GE(DTECHNiCAL CONSU ~T. ANTS August 31, 1992 SEP 05 '~9~2 Invoice No. 1153.1 ~ ~ ~.. ~~::~ ",-'~ ''i!! ';-~:F~, i .... ¥~'.-J H.T. Ardinger and Son, Company ..... ' '-'~ ....~ :' '~' .... c/o Nathan D. Maier Consulting Engineers Three Northpark 8800 N. Central Expressway, Suite 300 Dallas, Texas 75231 ATTN: Mr. Michael J. Garrett Construction Materials Testing Project No. 1153.1 ~ntry Z~'~tes Services from 06-18-92 Bethel School Road and Harris Street through 08-31-92 Coppell, Texas Engineering Technician Time No. of Date Hours Activity Cylinders 06-18-92 2.00 Proctor Pickup --- 07-28-92 1.50 Cancelled After --- Arrival 07-30-92 6.00 Density Testing --- Engineering Technician Time Regular Hours - 9.50 Hours @ $35.00/hour $ 332.50 Laboratory Testing Standard Proctor - 1 @ $110.00 each 110.00 TOTAL AMOUNT DUE $ 442.50 ~~~ Payment due within 30 days of Invoice Date. Ronald F. Reed, P.E. RFR/wde 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-O019 reed engineering GEOTECHNICALCONSULTAN~ August 31, 1992 Invoice No. 1154-1 H.T. Ardinger and Son, Company c/o Nathan D. Maier Consulting Engineers Three Northpark 8800 N. Central Expressway, suite 300 Dallas, Texas 75231 ATTN: Mr. Michael J. Garrett con~~--~n Materials Testing Project No. 1154 Be~_~l~ool Road/Harris Street Services from 07-25-92 Reconstruction through 08-11-92 Coppell, Texas Engineering Technician Time No. of Date Hours Activity Cylinders 08-07-92 2.00 Density Testing --- 08-10-92 2.00 Concrete Inspection 3 08-11-92 Cylinder Pickup --- Engineering Technician Time Soils Technician Regular Hours - 2.00 Hours @ $35.00/hour $ 70.00 Concrete Technician Regular Hours - 2.00 Hours @ $30.00/hour 60.00 Concrete Testing No. of Concrete Cylinders - 3 @ $12.00 each 36.00 No. of Cylinder Pickups - 1 @ $20.00/trip 20.00 TOTAL AMOUNT DUE $ 186.00 THANK YOU FOR YOUR BUSINESS Rev/ Payment due within 30 days Ronald F. Reed, P.E. RFR/wde 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-O019 Rone Engineers 1 ~ Goodnight Lane Tel. (214) 241-4517 ..... Incorporated Dallas,TX. 75229-3319 Metr ) ineers 49§? INVOICE .... ~ TM ~ ~ ~'-~'~ ~ ' '" Page To Invoice Numar CITY OF COPPELL 6180-CF C/O NATH~ ~ER I~oice Date 8800 N. CENT~ EXPY $300 AUGUST 31, 1992 D~LAS, TEX~ 75231 Terms: ATTN = MIKE G~TT Due U~n Receipt ~eference BETHEL SCH~L ~. RONE ENGINEERS PROJECT NO. D2-064A-OI L~ NO. 18868 AUGUST 21, 1992 4 2319 CONC~TE CYLINDERS 6 20.O0/ea 80.00 2.0 4130 TECHNICI~ TIME CONC~TE ~ 27.00/hr 54.00 13~.00 L~ NO. 18899 AUGUST 24, 1992 ~ 2319 CONC~TE CYLINDERS 6 20.O0/ea 80.00 3.0 4130 TECHNICI~ TIME CONC~TE ~ 27.00/hr 81.00 161.00 TOT~ ~OUNT DUE 295.00 Please Remit To: 11234 Goodnlght ~ne Dallas, Texas 752~ Thank You All accou~ not paid w~in ~ days of~e origina i~oice dae will ~ c~wg~ ~ ~nu~ i~ ~e of 1~. Environme~al, Remediation, Geotechnical, & Materials Teeing Professionals Rone Engineers 1 ,4 Goodnight Lane Tel. (214) 241-451' Incorporated Dallas,TX. 75229-3319 :Metro (214) 263-1555 neers Dallas/Fort Worth/Houston Fax (214)241-5174 (800) ~'z1~4{~4,'~ ~To Invoice Number CITY OF COPPELL 6137-CF C/O NATHAN MA[ER Invoice Date 8800 N. CENTPJLT., EXPY #300 AUGUST 15, 1992 DAT.,L.~S, TEXAS 75231 Terms: ATTN : MIKE GARRETT Due Upon Receipt Reference RONE ENGINEERS PROJECT NO. D2-O64A-Oi LAB NO. 18751 AUGUST 11, 1992 1 1369 ATTERBERG LIMITS ~ 35.00/ea 35.00 4 2519 GRADATION 6 20.00/ea 80.00 I I349 OPTIMUM MOISTURE CURVE ~ 120.00/ea 120.00 3.0 4130 TECHNICIAN TIME SOILS ~ 27.00/hr 81.00 316.00 LAB NO. 18779 AUGUST I3, 1992 2 1129 IN PLACE DENSITY TESTS ~ 15.00/ea 30.00 1.5 4130 TECHNICIAN TIME DENSITIES ~ 27.00/hr 40.50 70.50 TOTAL AMOUNT DUE 386.50 Please Remit To: 11234 Goodnlght Lane Dallas, Texas 75229 , Thank You All accounts not paid within 30 days of the original invoice date will be ch. arged an annual interest rate of 18%. Environmental. Remediation, Geotechnical, & Materials Testing Professionals