Loading...
MA FY 0607-AG070123AGENDA REQUEST FORM T " E ° I T Y ' O_F DEPT Engineering C OPPELL DATE January 23, 2007 T ITEM #: 9/E 11 WORK SESSION El CONSENT 1:1 REGULAR ITEM TYPE CONTRACT /BID or PROPOSAL ITEM CAPTION: Consider approval of awarding Bid # Q Enterprises in an amount of $300,000 as Manager to sign. GOAL(S): EXECUTIVE SUMMARY: 106 -04 for the annual Reinforced Concrete Paving Repair Project to Goteck dgeted in the Infrastructure Maintenance Fu d; and authorizing the City onao 0/ �� 1-1 2� Q Approval of this project will allow repairs to begin on Staff will be available to answer any questions at the FINANCIAL COMMENTS: citizen generated street and alley repair lists. it meeting. Funds have been budgeted in the Infrastructure Maintenance Fund for this project. RECOMMENDED ACTION: Staff recommends approval of the award of the bid to Goteck Enterprises in an amount of $300,000 for the annual Street and Alley Repair Project. ACTION TAKEN BY COUNCIL: APPROVED BY CITY COUNCII, ON ABOVE DATE f Libby Ball 1 20 0 7. 01.30 1 11:54:05 - 06'00' #Annual Street Repair Project MEMORANDUM TO: Mayor and City Council FROM: Kenneth M. Griffin, P.E., Director of Engineering and Public Works DATE: January 23, 2007 REF: Consider approval of awarding Bid # Q 1106 -04 for the annual Reinforced Concrete Paving Repair Project to Goteck Enterprises in an amount of $300,000, as budgeted in the Infrastructure Maintenance Fund; and authorizing the City Manager to sign. On December 19, 2006, the City of Coppell received and opened 7 bids for our yearly street and alley repair program. The contract for this project has a clause to extend the contract for up to four additional one -year periods. Our street and alley repair program for 2007 consists of approximately 4,000 square yards of street repair, at over 50 locations and approximately 2,500 square yards of alley repair at over 60 locations. Also, it includes the removal and replacement of approximately 100 linear feet of curbs at 10 locations. The City sent out letters to ten firms which generally perform this time of work, including Pavement Services, Quantum Contracting and Abcon Paving, the three firms which have performed this work for the city in the past. Also, to insure that we were reaching a wide range of bidders, this project was bid over the RFP Depot bidding service. This is an electronic bidding service that the City utilizes to alert contractors when projects are being bid. The contractors can go directly to the RFP Depot website and submit their bid. Of the seven firms who submitted bids, only two bidders were from the letters that we sent out to notify contractors that had previously worked in this area. The other five bids were submitted by contractors after they were notified by the RFP Depot website. The low bidder on the project, Goteck Enterprises, was not a firm that we had worked with in the past; but was a firm that was alerted by the RFP Depot. In this particular case, Goteck Enterprise's bid is approximately 7% lower than the next low bidder and about 21% lower than our current concrete price for street and alley repair. We allocate $300,000 per year in the Infrastructure Maintenance Fund for street and alley repairs and based on the current requests that we have, the Goteck Enterprises bid totaled $329,215. Because Goteck Enterprises has not previously worked in the City of Coppell and because I was unfamiliar with their work, I contacted Dallas County, which was listed as a reference for Goteck Enterprises. A representative from Dallas County stated that Goteck Enterprises had worked with them and successfully completed a project in the range of $350,000. The City of Coppell recommends awarding the FY 06/07 Street and Alley Replacement Project to Goteck Enterprises in an amount of $300,000, as budgeted in the Infrastructure Maintenance Fund. Staff will be available to answer any questions at the council meeting. 0 V a4 a G M W O N � 69 � 69 N � O O O O O 0 a N N 00 O k1r) It C M N 69 O N O O M O O O O 59 A N r 6s &� � CD k o o a w W) 69 Z N O N kn 69 b9 69 69 69 64 O O (25 O O G O O O O O O O O 00 O kr) O O O N O W A N 00 It o h M O Cl) 601) O a z o eq E Ioq Q M yj Ln O G O O O O O O O O O p G 46S 00 69 kf) 00 4 zs 69 HN9 [y O O O O O O O kn I N M O O �D 00 N N 4EOq 59 O oNO os kn O 46S W EI N O O C) O O p O p 00 69 N N O O O V 69 fn 64 6 z o � � U a Q U NO Q U O N p A C v � � • � .� � � � aai a � N Q C� U 0 H M N ¢ m N N i CA 0 V a4 a Ken Griffin - Project References for Goteck From: "Fred Cham" <faeham@a hotmail.com> To: <Kgriffm @ci.coppell.tx.us> Date: 1/2/2007 3:09 PM Subject: Project References for Goteck Dear Mr. Griffin, Attached is the spreadsheet with completed project references for Goteck Enterprises, LLC. For more information contact us 4693587988. Sincerely, Fred Chain Get FREE _Web site and company branded e -mail from_Microsoft Office Live 0 / / � y � % } � } k a \ � + K g_ ` w q ± � t\ � e 6 �$ /$ // \ 2/ = c » q r o q q A \\ // // / // $ # ƒ O q A & It & # & & ?\ 2/ 2/ 2 / # CN A q& A q A A A / o \ \ \ / / / / \ $ $ \ / \ k $ $ $ $ U O g q && && & 2 co JE CD 0 / f / § 2 \ 5 m® 0 2 � 2 17 2 cm f I E e E / $ k \ \ 2 & / \ / / / / \ 2 0 m n o ` ® % LO / / LO ± $ It C) % # / / / / Q 3 I m I 2 E 2 & f q q q q R O 2 O O O c / 5 % t f d \ 2 0 cu \ 0 § k > k \ / \ \ / E C U . / \ E k cu ¢ < ° a ƒ / / $ % $ \ O 7 Z g m f � / o & % / k L ¢ ± m I � % } � } k a \ � + K g_ ` w q ± � t\ � e 6