Loading...
Bethel School/Harris-CS 920519TO: Alan D. Ratliff, City Manager FROM: Kenneth M. Griffin, P.E., City Engineer~-~ SUBJECT: Sidewalks Along Harris & Bethel School Per May 13, 1992 Memo from Tom Morton DATE: May 19, 1992 The question that Tom Morton posed was, "Are sidewalks included in the construction plans for the Harris/Bethel School Road construction?" The answer is yes. However, only the sections adjacent to existing structures will be constructed with the street construction. This includes the two houses at the intersection of Brooks Lane with Harris Street and the 5 homes in the Shadowridge Estates subdivision on the north side of Bethel School. The other sections of the sidewalk will be constructed when the homes adjacent to the street are constructed. This includes the Country Estates subdivision, Chautauqua subdivision and the Big Cedar subdivision. This construction schedule is in accordance with Appendix A, Specific Requirements & Design Criteria, Section 8-B - Sidewalks, which states that "sidewalk construction may be delayed until development of lots." Delaying the construction of the sidewalks until the development of the lots is intended to protect the sidewalks from being damaged during the construction of the home. If you should you have any questions, please feel free to contact me. KMG/Dd ADR14