Loading...
ST1002-BD111214 Page 1 of 1 Keith Marvin - 18"STORM SEWER REPAIR From:   "Dennis Gulley" <dennis@rkmutility.com> To:   "Rick Odell" <rodell@ci.coppell.tx.us> Date:   12/14/2011 8:43 AM Subject:   18"STORM SEWER REPAIR Attachments:   121411 Freeport storm repair bid.xls   Rick attached is my bid for the 18"storm sewer repair. Thank you for asking me to bid on this work.   Dennis R. Gulley RKM Utility Services Inc. 1544 Valwood Parkway S.100 Carrollton Texas 75006 Office 972.241.2621 dennis@rkmutility.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4EEA0B46City_o...1/3/2012 12/15/2011 RKM UTILITY SERVICES,INC. 1544 VALWOOD PARKWAY STE.100 CARROLLTON TEXAS 75006 PH-972.241.2621 FAX-972.241.2624 BID PROPOSAL CREEK VIEW 18"STORM SEWER REPAIR CITY OF COPPELL TEXAS ITEMDESCRIPTIONQUANT.UNITUNIT PRICETOTAL 1 MOBILIZATION 2 18"CMP STORM SEWER 3 18"CMP FLARED END SECTION 4 3' X 3' GRATE INLET 5 IMPORT FILL MATERIAL 6 12" ROCK RIPRAP 7 CURLEX 250' X 8' TOTAL BID$24,836.00 Sheet 2 of 2 CREEK VIEW 18"STORM SEWER REPAIR MISC.ITEMS INCLUDEDEXCLUDED X HAUL OFF X BARRICADES X INLETS COMPLETE X TEMP.STREET PATCHING X LAB COST X PERFORMANCE BOND X MAINTENANCE BOND X STAKING X SEEDING OR CURLEX INSTALLATION X SAW CUTTING OR PAVEMENT REMOVAL or REPLACEMENT X CONCRETE ENCASEMENT X ADJUST MANHOLE- THAT WE BUILT X ADJUST CLEANOUT X REMOVE RCP-REQUIRED BY OUR WORK X DITCH GRADING X PIPE LINE MARKERS X REMOVE FENCE X SALES TAX X R.R.INSURANCE PROTECTIVE X CLEARING,GRUBBING OR EARTH WORK X AGC DUES X EROSION CONTROL X WORK REQUIRING LICENSED PLUMBER OR SPRINKLER CONTRACTOR All commitments for performance by RKM UtilityServices Inc are subject to the availability of materials and fuel from regular local commercial sources at approximately the same cost as on the bid date or unit prices may be adjusted The above quantities have been estimated for your convenience.However,this proposal is on a unit price basis with payments to be made on actual measured quantities of work complete. On the last day of each month estimates shall be prepared including all of the completed work plus all material on hand for the uncompleted portion,and 95% of the estimate shall be paid in full within 5 days after acceptance from the owner. Your acceptance of this proposal by signing and returning one copy witih (10) ten days and the approval by us of credit arrangements will constitute a contract between us,provided we are allowed to begin work within 15 days of the original proposal date. ACCEPTED:RKM UTILTY SERVICES INC. Company: Name DENNIS R. GULLEY Title: Estimator By: In signing you acknowlede you are a duly authorized agent of the owner, authorized to execute this document and to enter into agreements contained herein. RECEIVED ADDENDUMS NONE 10 DAYS WORK DAYS TO SUBSTANTIALLY COMPLETE BASED ON PLANS DATED NONE