Rick attached is my bid for the 18"storm sewer repair. Thank you for asking me to bid on this
work.
Dennis R. Gulley
RKM Utility Services Inc.
1544 Valwood Parkway S.100
Carrollton Texas 75006
Office 972.241.2621
dennis@rkmutility.com
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4EEA0B46City_o...1/3/2012
12/15/2011
RKM UTILITY SERVICES,INC.
1544 VALWOOD PARKWAY STE.100
CARROLLTON TEXAS 75006
PH-972.241.2621 FAX-972.241.2624
BID PROPOSAL
CREEK VIEW 18"STORM SEWER REPAIR
CITY OF COPPELL TEXAS
ITEMDESCRIPTIONQUANT.UNITUNIT PRICETOTAL
1
MOBILIZATION
2
18"CMP STORM SEWER
3
18"CMP FLARED END SECTION
4
3' X 3' GRATE INLET
5
IMPORT FILL MATERIAL
6
12" ROCK RIPRAP
7
CURLEX 250' X 8'
TOTAL BID$24,836.00
Sheet 2 of 2
CREEK VIEW 18"STORM SEWER REPAIR
MISC.ITEMS
INCLUDEDEXCLUDED
X
HAUL OFF
X
BARRICADES
X
INLETS COMPLETE
X
TEMP.STREET PATCHING
X
LAB COST
X
PERFORMANCE BOND
X
MAINTENANCE BOND
X
STAKING
X
SEEDING OR CURLEX INSTALLATION
X
SAW CUTTING OR PAVEMENT REMOVAL or REPLACEMENT
X
CONCRETE ENCASEMENT
X
ADJUST MANHOLE- THAT WE BUILT
X
ADJUST CLEANOUT
X
REMOVE RCP-REQUIRED BY OUR WORK
X
DITCH GRADING
X
PIPE LINE MARKERS
X
REMOVE FENCE
X
SALES TAX
X
R.R.INSURANCE PROTECTIVE
X
CLEARING,GRUBBING OR EARTH WORK
X
AGC DUES
X
EROSION CONTROL
X
WORK REQUIRING LICENSED PLUMBER OR SPRINKLER CONTRACTOR
All commitments for performance by RKM UtilityServices Inc are subject to the availability of materials and fuel from regular
local commercial sources at approximately the same cost as on the bid date or unit prices may be adjusted
The above quantities have been estimated for your convenience.However,this proposal is on a unit price basis
with payments to be made on actual measured quantities of work complete.
On the last day of each month estimates shall be prepared including all of the completed work plus all
material on hand for the uncompleted portion,and 95% of the estimate shall be paid in full within 5 days after
acceptance from the owner.
Your acceptance of this proposal by signing and returning one copy witih (10) ten days and the approval by us
of credit arrangements will constitute a contract between us,provided we are allowed to begin work within 15
days of the original proposal date.
ACCEPTED:RKM UTILTY SERVICES INC.
Company:
Name
DENNIS R. GULLEY
Title:
Estimator
By:
In signing you acknowlede you are a duly authorized agent of the owner, authorized to
execute this document and to enter into agreements contained herein.
RECEIVED ADDENDUMS NONE
10 DAYS
WORK DAYS TO SUBSTANTIALLY COMPLETE
BASED ON PLANS DATED NONE