ST1002-AG111213 ..Title Consider approval of Change Order Number 2 to the Old Town Coppell and Bethel Road Infrastructure Improvements (ST 10 -02) project to JRJ Paving, L.P. in the amount of $74,677.00; as provided in CIP funds; and authorizing the City Manager to sign all necessary documents. ..Summary Executive Summary: This change order will provide compensation to re -route a 16" water line that is in conflict with the 42" storm drain at the intersection of South Coppell Road and Bethel Road, and for the removal of approximately 9 yards of concrete blocking that was encountered when trying to install the proposed storm drain. It will also provide a pay item to be used at the City's discretion to direct the contractor to investigate, trace, and remove or abandon old water lines. Fiscal Impact: Staff Recommendation: Staff recommends approval of this Change Order #2. Goal Icon: Sustainable City Government �l1 . Business Prosperity 6 Special Place to Live T H E • C 1 T Y • O F COPPELL F e• 0 9 A S MEMORANDUM TO: Mayor and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM: Keith R. Marvin, P.E., Project Engineer DATE: December 13, 2011 RE: Consider approval of Change Order Number 2 to the Old Town Coppell and Bethel Road Infrastructure Improvements (ST10 -02) project to JRJ Paving, L.P. in the amount of $74,677.00; as provided in CIP funds; and authorizing the City Manager to sign all necessary documents. On September 13, 2011, Council awarded a contract to JRJ Paving, LP in the amount of $4,654,190.39 for the construction of Old Town Coppell and Bethel Road infrastructure improvements. This award amount included a $295,000.00 potential bonus set aside for early completion of various milestones throughout the project. Since this award, one change order was approved that had no monetary value associated with it, it simply adjusted milestone dates established in the contract at the request of the city's development partner and the contractor. The change order before you this evening is due to unforeseen utility conflicts encountered in the Bethel Road portion of the project. As discussed during the award of the project this area of town contains some of our oldest utility infrastructure. The records available for us to use during the design have proven to be incomplete and less accurate than we would have liked. This change funds the relocation of an existing 16" water line that is in direct conflict with the proposed 42" storm drain being constructed with this project. We are also adding a pay item for the contractor to continue to investigate and remove old water lines. We are adding this as an hourly rate pay item to be used at the city's discretion. As of the date of this meeting, the contractor has expended approximate 30 hours investigating and tracing existing water lines. We are proposing to pay them for the work completed to date, and include an additional 70 hours to be used in the future to trace the balance of the old lines in the area and ensure they are properly taken out of service. 1 Approval of this Change Order Number 2 will allow the contractor to move forward with the relocation of this conflicting water line, and continue with the Bethel Road portion of this project. It is our opinion that the contractor has provided fair and reasonable pricing for these changes, and we recommend approval of this change order in the amount of $74,667.00. Staff will be available to answer any questions at the council meeting. 2 CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Old Town Coppell and Bethel Road Infrastructure Improvements (ST 10 -02) CONTRACTOR: JRJ Paving, L.P. OWNER: City of Coppell CHANGE ORDER NO.: Two (2) DATE: December 13, 2011 1. This change order provides for compensation to re -route a 16" water line that is in conflict with the 42" storm drain at the intersection of South Coppell Road and Bethel Road. 2. This change also provides compensation for the removal of approximately 9 yards of concrete blocking that was encountered when trying to lay the storm drain. This blocking is directly in the way of the project, and needs to be removed. 3. Finally, this change provides a pay item to be used at the city's discretion to direct the contractor to investigate, trace and remove or abandon old water lines. Item Description Quantity Unit Unit Price Total ADD: 1 16" C905 DR18 100 LF $155.10 $15,510.00 PVC Water Line 2 16" x 16" Tapping 1 EA $18,645.00 $18,645.00 Sleeve and Valve 3 16" 22 '/2 Degree 2 EA $1,997.00 $3,994.00 Bend & Blocking 4 Connect to Existing 1 EA $2,431.00 $2,431.00 16" Water Line 5 Cut and Plug 3 EA $2,767.00 $8,301.00 Existing 16" Water Line 6 Necessary Testing of 1 LS $1,100.00 $1,100.00 Additional Water 7 Demolition and 1 LS $2,586.00 $2,586.00 Removal of Unforeseen Concrete Blocking 8 Labor and 100 Hour $221.00 $22,100.00 Equipment used to Expose, Locate, and Remove Old Water Lines from Service 209 Trench Safety 90.9 LF $0.11 $10.00 Total Revision to Contract Amount $74,677.00 Original contract amount $4,350,190.39 Net increase in contract amount $74,677.00 Revised contract amount $ 4,424,867.39 Cumulative increase in TOTAL change order amount (Percentage) 1.7% Net increase in contract time of completion 0 Revised Contract time of completion 350 Calendar Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. • • 1'Z. ' • commend • d . y City En; • eer Date 1 • Agreed to by Co: ctor b ate ��; / 9 ) Accepte► ity Date 7. • c u It . ' L a ' : 2 .. • ,s � , s di . ate a t \ Q V. r 1 ❑ q ♦ E - ^ Et S\ `, 1 N • w N ff ,0Q w 0 m w - 1 m z. -fri Y s � ` 0 Z d �•�,� Q `g gLVD [I] W - -, �' p11AGART� 1 Z , c o :. �... W w � a 0� CC C fr Z a Mp R °- f c w Q ❑ a� ! 3�1OO 4 d w Z [] ❑ Z ac w o w „>� wa Q Z U s < °` ° I s Ay U N Gd i LL8V3H i t] ab dVI NO±N3a >-- as ddl NOlN a aY"Ir 113E1 .9 . - a z J N I a8 1l dOO ° >- ' '5 ad Y T13ddbD , \ c� a o ANNd 12�Od332id / d / i . .. d'e. j N 1W Off!' - — 1 mr,unn.nc 4 w.: �4 �.. J I C \ , 14( 144 i i -.A., ' .;;:, - -, . _ ma ll 1 Z .. � U $� Q g. 4 ! w ro 3 LL U _ N F J I I ❑ W � J Q w0 Z I mss, it ID J a 1 Lid , J o y i C) _I I- 0 , a. x ` J Z [ :O d E I 0 W W U s ; ; s' r• t� W W ❑ a / I `= `, J r > o ,j u Z 9 ° EW O QV02! ll3dd00 u Z A 1.332ii.S.l7 a!! !W " __ , --- I t td o fl 0 R.- o j Q E pi q W . x.I { t o Q r r " m ❑ N i . W a H Z W . Z V1 q Z d' O lio Q xZ C F #. 03 ° Z s w, O Q e,9 s x y i . J m '! W W r , W Jj d h Z C W --„..... 0 ' 4 t w N ¢ Z 1 H O J , W d D ■ ' 1 . . 1 ,(7111 ...,_,.. . .. . ..... .... , 1 , 1 1 1 ,_. . (\7 . ,,.._, . ., . 4 ''. . " c.,