Loading...
ST9801-CS 991206 (2)FAX 214) 352 -3201 TELEPHONE (214) 358 -6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 DALLAS, TEXAS 75354 -0787 10605 HARRY HINES DALLAS, TEXAS 75220 December 6, 1999 Mr. Kevin C. Young, E.I.T. Freese and Nichols, Inc. 1341 W. Mockingbird Lane, Suite 230E Dallas, Texas 75247 Re: Coppell Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98 -01 Dear Mr. Young: In accordance with our discussions at the November 18, 1999 progress meeting and subsequent meetings in the field, we submit the following construction phasing traffic control plan for your review and approval: Phase 1: Detour traffic off of the section of Coppell Road from SH 121 to the Mansions main entrance (STA 37 +63) and close that section of the roadway. Upon closure of that section of the roadway, EBCC would excavate, lime stabilize, and pave that portion of the job and reopen the road to traffic. The roadway would be closed for approximately six weeks. The water line in that area must be laid and pass all tests prior to closure of the roadway. Phase 2: The City has requested that we consider constructing of the multi - barrel box culvert crossing in two stages rather than one stage while maintaining two way traffic on Coppell Road. As a result, this phase will be comprised of two stages. Stage 1 will include construction of a 20 feet detour at the existing elevation of the ground on the west side of the existing roadway and shoring the edge of the roadway to allow for construction of the downstream portion of the box structure. Elimination of the need for shoring will require that the detour only handle one way traffic 0 0 feet wide). Stage 2 will include construction of a detour over the newly constructed box and shoring that edge to allow for construction of the remainder of the box structure. This phase will take three to four months to complete and can occur simultaneously with phase 1. The additional cost for construction of the box in this manner is $239,740.00. I have enclosed a breakdown of this cost for your review. Phase 3: This phase will include construction of the western half of Coppell Road from Sandy Lake Road to STA 37 +63. This portion of the project will be constructed while maintaining one way traffic (north bound) from Sandy Lake Road to STA 39 +00 and two way traffic from STA 39 +00 to the end of the project. This work will take approximately two months to complete. AN EQUAL OPPORTUNITY EMPLOYER Page 2 Coppell Road Reconstruction Re: Construction phasing/traffic control Phase 4: This phase will include construction of the eastern half of Coppell Road from Sandy Lake Road to STA 37 +63. This portion of the project will be constructed while maintaining one way traffic (north bound) from Sandy Lake Road to STA 39 +00 and two way traffic from STA 39 +00 to the end of the project. This work will take approximately two months to complete. Please inform our office of your decision regarding this construction phasing/traffic plan. If you have any questions regarding this information, don't hesitate to contact our office. Sincerely, Ed Bell Construction Company Robert D. Weber Project Engineer xc: Mr. Kent Collins, P.E., Engineering and Public Works, City of Coppell 255 Parkway Blvd., Coppell, Texas 75019 -4409 EXTRA COST BREAKDOWN FOR TWO STAGE CONSTRUCTION OF THE BOX CULVERT Stage 1 Dirt work for two lane detour (at existing grade) $7,280.00 HMAC for detour surface (250 TNS) (1 OOOSY) $18,930.00 Remove detour $5,000.00 Striping for detours $1,500.00 Shoring at box end and between box and road (2180 SF) $54,300.00 Drainage through shoring $2,180.00 Extra handling of dirt (2600 CY) $15,800.00 Stage 2 Dirt work for detour $10,500.00 Provide and set CTB w/ end protection (300 LF) $10,800.00 Remove CTB w/ end protection $3,500.00 HMAC for detour surface (220 TNS)(890 SY) $17,250.00 Remove detour $4,000.00 Additional traffic control $12,000.00 Striping for detours $1,500.00 Labor/Equipment increase for decreased production $75,200.00 Total $239,740.00 i 4 i 1 _I I / o Y] ❑ 14-00 it 7 m YA v t 1 1 I j 7 Bar is one Inch on original drawing. If �r not one Inch on this sheet adjust scale. CITY OF COPPELL, TEXAS PAVING AND DRAINAGE IMPROVEMENTS FOR COPPELL ROAD PHASE 4 i t k .ZI 1 (f .f m Ono � DOm , �A j n rpyi p O f � ] OY vp �y m y � 1 y _ ��_ y l i n O Y O wN n Q xy� � OZ 1 I : >7 , C trii ZtD ._ r 0 j -i Vi D p^ mz G C O O �< 9 O om m b ° z. F tim z > I O W O < 7 � � Ab4TCHUNE 36+50 y � � y 7 Bar is one Inch on original drawing. If �r not one Inch on this sheet adjust scale. CITY OF COPPELL, TEXAS PAVING AND DRAINAGE IMPROVEMENTS FOR COPPELL ROAD PHASE 4 O il A II.��,O I i Ul ... _. / -.� f v. _ e o •..�.,....., , y- f �- Bar is one Inch an original drawkn. if not one Inch on this e6eet adjust scale. CITY OF COPPELL, TEXAS PAVING AND DRAINAGE IMPROVEMENTS FOR COPPELL ROAD PHASE 3 l �a I/ -i L .I n M n b g p o 09 0 m p o z3 04 c H 4 ' ip w 00 a yo . y to > 0 Od ( v ro r o 3 0 0 � > >ro t j y y 0 O L 0 9 t7 ra ra m H C s E g � Bar is one Inch an original drawkn. if not one Inch on this e6eet adjust scale. CITY OF COPPELL, TEXAS PAVING AND DRAINAGE IMPROVEMENTS FOR COPPELL ROAD PHASE 3 l �a I/ -i L .I / t 7 I - -!. .......... %t n n � � 0 � -� 111 p s Y c2po o � � P K ��` a yy`Zr G r* S Y Dy )°e Y „ O - N On >m 0CC .04,- z On O�p- f1 y �z 7 0 - H z 0 0 0 r m O m O Y• d O� CI y > •n m m <. m 0 w O O n2 0 �9x 0 j Bor is one Inch on original drawing. It .I not one Inch on this shoot, adjust scale. CITY OF COPPELL, TEXAS PAVING AND DRAINAGE IMPROVEMENTS FOR COPPELL ROAD PHASE 2 4. N a S I h;I �1 I / IL`�ru% � L d 4, .I i I .r. I r� r l i � r l Bcr is ono inch on original drawing. If not no Inch on this shot, ad)ust scab. I CITY OF COPPELL, TEXAS PAVING AND DRAINAGE IMPROVEMENTS FOR COPPELL ROAD PHASE 1 n � ` n r < O 09P rD WD Oy <~ °n O p T u ti 0 z y p m G x y m n G S M 0 lino x ° G C ro O b n D C C a b O a 0 O° _ x H -a > D O J 1m < g < M �b �0 y y a d n 3 Bcr is ono inch on original drawing. If not no Inch on this shot, ad)ust scab. I CITY OF COPPELL, TEXAS PAVING AND DRAINAGE IMPROVEMENTS FOR COPPELL ROAD PHASE 1