ST0501-CS120103 December 15, 2011
"Executive Director"
Texas Commission on Environmental Quality
Storm Water and Pretreatment Team
P.O. Box 13087, MC -148
Austin, Texas 78711 -3087
Dear Executive Director,
This letter serves to designate a Company who will have day -to -day operational controls
of those activities at a construction site which are necessary to ensure compliance with
the storm water pollution prevention plan that has been developed for this site.
Name: Tiseo Paving Company, Inc.
Title: Primary Operator / Daily Operational Controls
Project Name: Deforest Road Reconstruction
Project Location: From MacArthur Boulevard to Windsor Estates, Coppell, Texas 75019
By signing this authorization, I confirm that I meet the following requirements to make
such a designation as set forth in the Texas Administrative Code Title 30 Part 1 Chapter
305 Subchapter C Rule 305.44 and Title 30 Part 1 Chapter 305 Subchapter F Rule
305.128.
"I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designated to assure that qualified
personnel properly gathered and evaluated the information submitted. Based on my inquiry of
the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief,
true, accurate, and complete. l am aware there are specific penalties for submitting false
information, including the possibiliti- of fine and imprisonment for knowing violations."
Signature: �% Date: 1
Printed Name: kc4 ' V\ Titl "V\ck tv
Secondary Operator: CITY OF COPPELL