ST9801-PR 080606rv) x 6/6/2008
FOX CONTRACTORS, INC.
BID PROPOSAL
HUNTERWOOD PARK 8" WATER LINE
CITY OF COPPELL
ATTN: Keith Marvin
Item
No.
Description
Unit
Measure
Unit
Price
Quantity
Total
Price
1
Mobilization
ea
$
2,000.00
1
$2,000.00
2
8" DR 14 C -900 water pipe
If
$
48.00
492
$23,616.00
4
1" Water service w/ 200' copper
ea
$
1,236.00
4
$4,944.00
5
2" Irrigation service w/ 40' copper
ea
$
1,820.00
1
$1,820.00
6
8" 45° Bend w/ mega lug
ea
$
350.00
5
$1,750.00
7
8" 221/2° Bend w/ mega lug
ea
$
350.00
1
$350.00
8
8" 111/4° Bend w/ mega lug
ea
$
350.00
1
$350.00
9
8" 90° Bend w/ mega lug
ea
$
350.00
1
$350.00
10
8 "x8" MJ tee w/ mega lug
"x6"
ea
$
445.00
1
$445.00
11
8 Reduser w/ mega lug
ea
$
250.00
2
$500.00
12
Connect to ex. 6" water line
ea
$
1,800.00
2
$3,600.00
13
Connect to ex. 8" water line
ea
$
700.00
1
$700.00
14
8" Gate valve w/ mega lug
ea
$
1,015.00
1
$1,015.00
15
Remove & replacing ex. Concrete Paving
sy
$
65.00
40
$2,600.00
16
Remove & replacing ex. sidewalk Paving
sy
$
50.00
25
$1,250.00
17
Grass sod
sy
$
5.00
520
$2,600.00
18
Two year bond if required
ea
$
1,344.04
1
$1,344.04
Grand total $49,234.04
EXCLUSIONS
INSPECTIONS FEES
PERMITS REQUIRED
SWPPP
ADDENDUM UNKNOWN