Loading...
ST9801-PR 080606rv) x 6/6/2008 FOX CONTRACTORS, INC. BID PROPOSAL HUNTERWOOD PARK 8" WATER LINE CITY OF COPPELL ATTN: Keith Marvin Item No. Description Unit Measure Unit Price Quantity Total Price 1 Mobilization ea $ 2,000.00 1 $2,000.00 2 8" DR 14 C -900 water pipe If $ 48.00 492 $23,616.00 4 1" Water service w/ 200' copper ea $ 1,236.00 4 $4,944.00 5 2" Irrigation service w/ 40' copper ea $ 1,820.00 1 $1,820.00 6 8" 45° Bend w/ mega lug ea $ 350.00 5 $1,750.00 7 8" 221/2° Bend w/ mega lug ea $ 350.00 1 $350.00 8 8" 111/4° Bend w/ mega lug ea $ 350.00 1 $350.00 9 8" 90° Bend w/ mega lug ea $ 350.00 1 $350.00 10 8 "x8" MJ tee w/ mega lug "x6" ea $ 445.00 1 $445.00 11 8 Reduser w/ mega lug ea $ 250.00 2 $500.00 12 Connect to ex. 6" water line ea $ 1,800.00 2 $3,600.00 13 Connect to ex. 8" water line ea $ 700.00 1 $700.00 14 8" Gate valve w/ mega lug ea $ 1,015.00 1 $1,015.00 15 Remove & replacing ex. Concrete Paving sy $ 65.00 40 $2,600.00 16 Remove & replacing ex. sidewalk Paving sy $ 50.00 25 $1,250.00 17 Grass sod sy $ 5.00 520 $2,600.00 18 Two year bond if required ea $ 1,344.04 1 $1,344.04 Grand total $49,234.04 EXCLUSIONS INSPECTIONS FEES PERMITS REQUIRED SWPPP ADDENDUM UNKNOWN