Rhonda Adloo - Red Hawk
From: Michael Garza
To:Terry Holmes
Date: 1/13/2012 11:36 AM
Subject: Red Hawk
CC:Lynn Kadleck; Rhonda Adloo
Terry,
There are several items that you need to be aware of prior to paving your site: We still need location
verification of the water and sanitary sewer that you did a field change. There are federal and state
requirements on separation of water and sewer and I would like to make sure that you are meeting those
requirements. I would hate for you to pour your street section and have to remove it because you do not meet
the requirements. There are several other utilities that you moved in the field such as inlets, storm drain and
fire hydrants that need to be verified prior to pouring.
Also you will not be allowed to work on Monday since it is a holiday and nobody will be here. Over the Christmas
break you had the utility contractor working on a holiday which was not acceptable, we may ask you to remove
that paving section that was poured in Bethel School since we did not have an inspector working.
Also, during the plan review process we required the steel to be #4 bars since our details were in the process of
being updated. It was noted on the first page of the paving plan as we required. I know some of the
other sheets still say to follow the city of coppell standard construction details, however the first page of our
details says the City has the right to change any detail at anytime.
If you have any questions please contact me at your convenience.
thanks,
Mike