Loading...
ST0502B-CS111221 e 'Ye' k!- J e, .1_ Vic. �a ! 2 ST 05OZ5 Draft Memo From: Victor M. Zepeda 214 -341 -9900 To: WFC, Trustee (IA and C -B Foundation) Carlos Lascurain, ARWS Texas, L.P. (Also: Forward to State of Texas) Ken Griffin, Coppell City Engineer American Tower Corp. (Cell Tower Lease) (Re: New Access) Memo is for your information. In order to enable the Trustee and obtain agreement of monetary contribution amounts from each of those concerned, I request your individual commentary (written) ASAP on each item including what each might add to the total of any items. q 17 1 .S ( m r cict t= c.r w.s�t Dec 21 11 05:02p Arredondo, Zepeda & Brun¢ 214 -341 -9925 p.2 Draft memo, prepared for discussion purposes. Memo of Understanding I believe it prudent to restate my understanding of your needs for the property on SH121. The Property under discussion is generally described as that property bound to the west by Coppell Road, to the east by S.H 121, to the south by Sandy Lake Road and to the north by the One Twenty One Canyon Business Park/Office Park bound to its north by Canyon Road. Concerns: You are presently evaluating and responding to two requests which could impact or modify previously prepared plans for the property, summarized as: 1. A request from TxDOT soliciting the acquisition of additional property for State Highway Right-of-Way (R.O.W.) identifying parcels which abut 636.22' of frontage road on the eastern portion of said property. 2. The desire to maintain, intact, the present location for the Metro PCS 50'x50' easement, which ultimately impacts a previous property dedication to a charitable Foundation. Understanding: To leave the Metro PCS easement in its present location, the following technical activities will need to be addressed: a. The roadway alignment will have to be moved easterly by approximately fifty feet, recalculated, and allowance for curvature and velocity modifications to assure compliance with the City of Coppell Design Codes. b. The new alignment may also require an adjustment at SH 121 to accommodate the revisions to Freeport Parkway extension alignment and the proposed location for the TxDOT ROW intersection. c. A previously dedicated property (the Freeport Parkway extension) to a non-profit Foundation will have to be reversed, and the new alignment will require a Roadway Property Description (in metes and bounds) accompanied by field monumentation (as required by the State of Texas). Dec 21 11 05:02p Arnedondo, Zepeda & Brut¢ 214 - 341 -9925 p.3 Proposal: If our understanding of your needs are correct, AZ &B will prepare a proposal to provide you Surveying and Engineering services, which will include the following tasks: i. An engineering review and recalculation for the revised Freeport Parkway Extension Alignment. Upon completing the new alignment prepare an 8-1/2" x 11" sketch for your approval. ii. After sketch approval, a survey to identify existing benchmarks in the field which abut the property on the Sandy Lake Road and SH 121 will commence. Field survey personnel will also then set monumentation for the proposed property dedication, complying with the State of Texas requirements. iii. Once the field data is analyzed and converted, a new Roadway Property Description (in rnetes and bounds) will be prepared. Estimate of Costs Engineering Tasks I & ii — approximately $ 2,000. Surveying Field /Office for task ill -- approximately $16,000. For budgeting purposes we recommend a Not to Exceed budget of $20,000. •