ST8503-CS 890831August 31~, 1989
'\
Mr. Mike A~bert
Ed Bell ConStruction
P. O. Box 540787
Dallas, Texas 75354-0787
RE: BETHEL SCHOOL ROAD IMPROVEMENTS (HEARTZ ROAD TO MOORE ROAD)
Dear Mr. Albert:
The purpose of this letter is for notification that the above listed
project will require warrant work under your one year maintenance
bond.
1. Route and seal all asphalt joints and separations in paving
section.
2. Patch holes in paving at Hunters Ridge.
3. Route and seal the curb and gutter at the driveway of 501 Hunters
Ridge.
4. Replace missing fire hydrant marker at Hunters Ridge.
5. Patch honeycomb at drop inlet near 316 Bethel School Road.
6. Remove and replace curb at 401 Rolling Hills.
7. Repair paving section holding water on the southeast side of
Hunters Ridge.
Please respond and make repairs as soon as possible.
If you have any questions regarding this matter, please advise.
P~ iYcD/woV~s Inspector
LD/bb ~ ~
xc: Russell R. Doyle E., City Engineer
Benjamin dela CruZ, Engineering Technician
Steve Goram, Director of Public Works
Howard Pafford, Water Utilities Superintendent
Per Birdsall, Street Superintendent
Gabe Favre, Ginn Inc.