Loading...
Carter Addn 3-CS120105 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-246R-SF-12, Carter Addition PH III , a zoning change from SF-12 (Single Family-12) to PD-246R-SF-12 (Planned Development-246 Revised-Single Family-12), to attach a Detail Site Plan to permit 23 single-family lots and one common area lot on 20.28 acres of property located on the south side of Carter Drive, approximately 925 feet west of Moore Road, at the request of Toll Brothers, being represented by Matt Alexander, Dowdey, Anderson & Associates, Inc. STAFF REP.: Marcie Diamond PROJECT ID# PD-11-0041 DRC DATE: December 29, 2011 and January 5, 2012 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED  AFTER P&Z 1. There will be additional comments during detailed engineering plan review. 2. Pavement will need to be 30’ back to back with mountable curbs. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Carter Addition PH III, Replat , being a replat of the Carter Addition Phase III to re-subdivide the existing 24 single-family lots and two common area lots into 23 single-family lots and one common area lot on 20.28 acres of property located on the south side of Carter Drive, approximately 925 feet west of Moore Road, at the request of Toll Brothers, being represented by Matt Alexander, Dowdey, Anderson & Associates, Inc. STAFF REP.: Marcie Diamond PROJECT ID# RP-11- 0042 DRC DATE: December 29, 2011 and January 5, 2012 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED  AFTER P&Z 1. Include the floodplain note "no fences, structures etc. allowed in the floodplain and maintenance is responsibility of property owner etc....."