Loading...
Arbor Manors 4R2-CS120105 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-214R5-C, Arbor Manors Addition Retail, a zoning change request from PD- 214R2-C (Planned Development-214 Revision 2-Commercial) to PD-214R5-C (Planned Development-214 Revision 5-Commercial) to attach a Detail Plan to allow the development of an 11,000 square foot retail building to contain retail and office uses including two restaurants, one of which will have drive-through service on 1.5 acres of property located at 143 S. Denton Tap Road, approximately 145 feet north of W. Braewood Drive, at the request of Hermansen Land Development, Inc. being represented by Randi Rivera, G&A Consultants. STAFF REP.: Matt Steer PROJECT ID# PD-11-0045 DRC DATE: December 29, 2011 and January 5, 2012 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED  AFTER P&Z 1.You will need permission from the property owner to the south for the driveway since a portion will be on their property. 2. There will be additional engineering comments during detailed plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Arbor Manors Addition, Lot 4R2R, Block A, being a replat of Lot 4R2, Block A of the Arbor Manors Addition, to relocate the existing fire lane and mutual access easement and to establish easements to allow the development of an 11,000-square-foot retail building on 1.5 acres of property located at 143 South Denton Tap Road, approximately 145 feet north of West Braewood Drive, at the request of Hermansen Land Development, Inc., being represented by Randi Rivera, G&A Consultants. STAFF REP.: Matt Steer PROJECT ID# RP-11- 0046 DRC DATE: December 29, 2011 and January 5, 2012 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED  AFTER P&Z 1. You will need permission from the property owner to the south for the driveway since a portion will be on their property. 2. There will be additional engineering comments during detailed plan review.