Arbor Manors 4R2-CS120105
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-214R5-C, Arbor Manors Addition Retail,
a zoning change request from PD-
214R2-C (Planned Development-214 Revision 2-Commercial) to PD-214R5-C
(Planned Development-214 Revision 5-Commercial) to attach a Detail Plan to
allow the development of an 11,000 square foot retail building to contain retail
and office uses including two restaurants, one of which will have drive-through
service on 1.5 acres of property located at 143 S. Denton Tap Road,
approximately 145 feet north of W. Braewood Drive, at the request of Hermansen
Land Development, Inc. being represented by Randi Rivera, G&A Consultants.
STAFF REP.: Matt Steer PROJECT ID# PD-11-0045
DRC DATE:
December 29, 2011 and January 5, 2012
CONTACT:
Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1.You will need permission from the property owner to the south for the driveway since a
portion will be on their property.
2.
There will be additional engineering comments during detailed plan review.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Arbor Manors Addition, Lot 4R2R, Block A,
being a replat of Lot 4R2, Block
A of the Arbor Manors Addition, to relocate the existing fire lane and mutual
access easement and to establish easements to allow the development of an
11,000-square-foot retail building on 1.5 acres of property located at 143 South
Denton Tap Road, approximately 145 feet north of West Braewood Drive, at
the request of Hermansen Land Development, Inc., being represented by Randi
Rivera, G&A Consultants.
STAFF REP.: Matt Steer PROJECT ID# RP-11- 0046
DRC DATE:
December 29, 2011 and January 5, 2012
CONTACT:
Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. You will need permission from the property owner to the south for the driveway since a
portion will be on their property.
2. There will be additional engineering comments during detailed plan review.