Carter Addn 3-CS111229 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-246R-SF-12, Carter Addition PH III , a zoning change from SF-12 (Single Family-12) to PD-246R-SF-12 (Planned Development-246 Revised-Single Family-12), to attach a Detail Site Plan to permit 23 single-family lots and one common area lot on 20.28 acres of property located on the south side of Carter Drive, approximately 925 feet west of Moore Road, at the request of Toll Brothers, being represented by Matt Alexander, Dowdey, Anderson & Associates, Inc. STAFF REP.: Marcie Diamond PROJECT ID# PD-11-0041 DRC DATE: December 29, 2011 and January 5, 2012 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. The sanitary sewer should tie into an existing manhole, we do not want any additional manholes. 2. The water line will have specific comments during detailed engineering plan review. 3. The runoff will need to be picked up before it turns down Legacy Court, we do not allow valley gutters in the street section. 4. The drainage will be evaluated further during detailed plan review, specifically along Carter. 5. Label floodplain per CLOMR and the current effective map. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Carter Addition PH III, Replat , being a replat of the Carter Addition Phase III to re-subdivide the existing 24 single-family lots and two common area lots into 23 single-family lots and one common area lot on 20.28 acres of property located on the south side of Carter Drive, approximately 925 feet west of Moore Road, at the request of Toll Brothers, being represented by Matt Alexander, Dowdey, Anderson & Associates, Inc. STAFF REP.: Marcie Diamond PROJECT ID# RP-11-0042 DRC DATE: December 29, 2011 and January 5, 2012 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. Label easements clearly. 2. The water line easement will need to be filed prior to beginning work. 3. You will need approval from DART for the storm drain outfall. 4. Approval needed from Explorer Pipeline for crossing with the storm drain. 5. Clean up the plat, turn off topo, etc.