Loading...
Red Hawk-LR120119 (2)MECHANICAL STABILIZATION/MODIFICATION 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 FINAL MIX Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 TESTED FOR:Creststone GroupDATE:01/19/12 Coppell, Texas PROJECT:Red Hawk ResidentialOUR REPORT NO.:110991-51 Coppell, TexasTECHNICIAN:Yonas Tanga AREA OF WORK:Street DATE CEMENTLIMEXINITIALLY APPLIED01/17/12 DATE OF FINAL MIXING01/19/12 TEST LOCATION: % PASSING% PASSING 1 3/4" SIEVE#4 SIEVE 1.West Lane Blackburn Drive at Station 1+00100%62% 2.East Lane Blackburn Drive at Station 1+00100%61% 3.Blackburn Drive at Station 2+60100%60% 4.Oxford Place at Station 4+00100%62% 5.Oxford Place at Station 7+00100%63% 6.Oxford Place at Station 9+43100%64% 7.Washington Drive at Station 12+00100%63% REMARKS: Respectfully Submitted, Yonas Tanga ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of Alpha. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.