Rhonda Adloo - Erosion control bond info for Royal Oaks
From: Rhonda Adloo
To:marc.zett@brightco.com
Date: 1/25/2012 3:13 PM
Subject: Erosion control bond info for Royal Oaks
CC:Michael Garza
Attachments: Erosion control bond.pdf
This item was mentioned in the pre-con, but you may want to get the homebuilder (ALH) to put up the bond
since you will be out of the equation for all intents and purposes, and they will still be there until build-out. This
is a requirement for final acceptance of a residential subdivision, I hope that Rick mentioned it to you during the
walk-thru.
The attached is a portion of the Subdivision Ordinance that explains the requirement and necessity of providing
an erosion control bond for residential projects for a period of 2 years or until build-out, whichever comes first.
All I need is a copy of the invoice for erosion control structures that will remain in place during home
construction within the subdivision and a check equal to that amount. The amount of the check will be returned
to the payer after 2 years unless any portion of it must be used to repair/replace the existing structures during
that time period.
Call me or reply to this message if you have any questions.
Rhonda Adloo
Engineering Department
Administrative Technician
972/304-3682
radloo@coppelltx.gov
Consider the environment before printing this email.
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4F201C08City_of...3/8/2012
Page 1 of 1
Rhonda Adloo - Re: Royal Oaks
From: Michael Garza
To:Rhonda Adloo
Date: 1/25/2012 2:26 PM
Subject: Re: Royal Oaks
Marc would probably be the one to contact.
thanks,
Mike
>>> On 1/25/2012 at 2:23 PM, in message <4F2064DB.F4C : 67 : 49597>, Rhonda Adloo
<radloo@coppelltx.gov> wrote:
do you want me to contact Marc or the homebuilder about it?
>>> Michael Garza 1/25/2012 2:20 PM >>>
Yes, they will need an erosion control bond.
>>> On 1/25/2012 at 2:05 PM, in message <4F206074.6C2 : 67 : 49597>, Rhonda Adloo
<radloo@coppelltx.gov> wrote:
Marc Z just paid the street sign fee & I notified Per B.
Was anything mentioned in their pre-con about an Erosion Control bond? We have the UG
infrastructure bond from Conatser, but won't they need to bond erosion control on the site until all lots
are built?