ST0301-ES051208T H E C I T Y O F
COPPELL
F , q
December 8, 2005
Mr. Jalal Khorrami
449 Bethel Road
Coppell, Texas 75019 -4417
RE: Bethel Road II
ST 03 -01
Parcel 18 — Permanent Right -of -Way
Dear Mr. Khorrami:
The City of Coppell is currently working with the engineering firm of Freese & Nichols to design
the Bethel Road II project. The project will consist of the reconstruction of Bethel Road from
Freeport Parkway to Denton Tap Road, and Coppell Road from Bethel Road to Cooper Lane.
The existing two -lane asphalt roadways will be reconstructed as two -lane concrete roadways with
improved drainage and sidewalks. The work will also include the installation of traffic signals,
and landscaping and enhanced pavement in the Old Coppell area.
The project is in the final design phase, and the city is in the process of acquiring right -of -way
and easements from 24 parcels within the project limits. It will be necessary to acquire
permanent right -of -way from your properties located at 449 Bethel Road and 701Coppell Road.
The properties have been designated as Parcel 18 on the 'Bethel Road Proposed Right -of -Way
Map'. The right -of -way is needed for the construction of on- street parking, and the sidewalk/trail
system.
With this letter I am providing a copy of the legal description and plat for Parcel 18. Please
review the enclosed documents and let me know if you have any questions or if you wish to view
the construction plans. It is anticipated that construction will begin in the 2 "d quarter of 2007.
Your consideration of this matter is appreciated.
Sincerely,
Suzan aylor
CIP Codrdinator
Engineering Department
Direct: 972 - 304 -7019
Fax: 972 - 304 -3570
E -mail: staylor @ci.coppell.tx.us
Enclosures
LOP PE(4
YEARS IN
9 53-10 05
255 PARKWAY * P.0.80X 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673