Loading...
ST0001-LR960508 'ONCRETE COMPRESL _ JE STRENGTH TEST fDC RCINEHUM, INC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 ate of Service: 05/08/1996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 963445 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples." PROJECT DATA :)NTRACTOR: Austin Bridge & Road )NCRETE SUPPLIER: Lattimore ]Materials .ANT: 7 'ECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 3" Max AIR: N/A .ST METHOD: ASTM C -39 NO. ASTM C -172 TESTED ASTM C -143 CONCRETE CLASS: 42 PLACEMENT DATE: 05/08/1996 BATCH TIME: 2 :21 pm TIME SAMPLED: 3 :07 pm BY: Barry Cuble WEATHER CONDITIONS: Sunny with light winds TEMPERATURE (F) - AIR 86 F CONCRETE: 84 F TRUCK NO: 574 TICKET NO: 7020996 AIR CONTENT ( %): 4.1% UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Inlets on Creekview Dr. SAMPLE LOCATION: Inlets ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3920 4010 Note: No specifications were available, information was provided by the contractor. echnician: Barry Cuble Started: 1:30 pm Finished: 4:00 pra Ineer' g, Inc. eport Distribution: Emerson Partners, Inc. City of Coppell Eugene Harbour Rust Lichliter /Jameson Vice President Austin Bridge & Road, Inc. AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD 4ET NO. ('inches) TESTED (days) (lbs. force) 1 1 3.0 05/15/1996 7 110710 1 2 3.0 05/15/1996 7 113360 1 3 3.0 06/05/1996 28 1 4 3.0 06/05/1996 28 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3920 4010 Note: No specifications were available, information was provided by the contractor. echnician: Barry Cuble Started: 1:30 pm Finished: 4:00 pra Ineer' g, Inc. eport Distribution: Emerson Partners, Inc. City of Coppell Eugene Harbour Rust Lichliter /Jameson Vice President Austin Bridge & Road, Inc. AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPRL -jSIVE STRENGTH TES _ 4747 Irving Blvd., Stine #206 Dallas, Texas 75247 Date of Service: 05/08/1996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 963445 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. ** PROJECT DATA CONTRACTOR: Austin Bridge & Road CONCRETE SUPPLIER: Lattimore Materials PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 3" Max AIR: N/A TEST METHOD: ASTM C -39 SET NO. ASTM C -172 TESTED '(days) ASTM C -143 CONCRETE CLASS: 42 PLACEMENT DATE: 05/08/1996 BATCH TIME: 2:21 pm TIME SAMPLED: 3 :07 pm BY: Barry Cuble WEATHER CONDITIONS: Sunny with light winds TEMPERATURE (F) -AIR 86 F CONCRETE: 84 F TRUCK NO: 574 TICKET NO: 7020996 AIR CONTENT ( %): 4.1 % UNIT WEIGHT (pcf): NIA PLACEMENT LOCATION: Inlets on Creekview Dr. SAMPLE LOCATION: Inlets ACCUMULATIVE YARDS: 10 Note: No specifications were available, information was provided by the contractor. FRACTURE TYPE Technician: Barry Cuble Started: 1:30 pm Finished: 4:00 pm 1 lneerig, Inc. Report Distribution: (1) Emerson Partners, Inc. (1) City of Coppell Eugene Harbour (1) Rust Lichliter /Jameson Vice President (1) Austin Bridge & Road, Inc. 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc REPORT OF TESTS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED '(days) (16s. force) (psi) 1 1 3.0 05/15/1996 7 110710 3920 1 2 3.0 05/15/1996 7 113360 4010 1 3 3.0 06/05/1996 28 1 4 3.0 06/05/1996 28 Note: No specifications were available, information was provided by the contractor. FRACTURE TYPE Technician: Barry Cuble Started: 1:30 pm Finished: 4:00 pm 1 lneerig, Inc. Report Distribution: (1) Emerson Partners, Inc. (1) City of Coppell Eugene Harbour (1) Rust Lichliter /Jameson Vice President (1) Austin Bridge & Road, Inc. 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc ae C ONCRETE COMPRESSIVE STRENGTH TES i fDC ENGINEERING, INC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service; 0510811996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 963445 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. ** PROJECT DATI CONTRACTOR: Austin Bridge & Road CONCRETE SUPPLIER: Lattimore Materials PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @Q 28 Days SLUMP: 3" Max AIR: N/A TEST METHOD: ASTM C -39 ASTM C -172 ASTM C -143 CYLINDER MARKED SET NO. MEASURED SLUMP (niches) CONCRETE CLASS: 42 PLACEMENT DATE: 05/08/1996 BATCH TIME: 2 :21 pm TIME SAMPLED: 3 :07 pm BY: Barry Cuble WEATHER CONDITIONS: Sunny with light winds TEMPERATURE (F) -AIR 86 F CONCRETE: 84 F TRUCKNO: 574 TICKET NO: 7020996 AIR CONTENT ( %): 4.1% UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Inlets on Creekview Dr. SAMPLE LOCATION: Inlets ACCUMULATIVE YARDS: 10 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 1 1 3.0 05/15/1996 7 1 2 3.0 05/15/1996 7 1 3 3.0 06/05/1996 28 1 'i 1 n n�inc n J6 JJ/1796 no L.6 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 110710 3920 113360 4010 150500 5320 1.0nl 1 1� cn4n L tv Note: No specifications were available, information was provided by the contractor. Technician: Barry Cuble Started: 1:30 pm Finished: 4:00 pm 1W Engiq.@dU* Report Distribution: (1) Emerson Partners, Inc. (1) City of Coppell Eugene Harbour (1) Rust Lichliter /Jameson Vice President (1) Austin Bridge & Road, Inc. 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc