Loading...
ST0001-LR960430CONCRETE COMPRESSIVE STRENGTH TEST fDC ENGWMRM, WC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 04/30/1996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 963179 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. ** PROJECT DATA CONTRACTOR: Austin Bridge & Road CONCRETE SUPPLIER: `1'X1 PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 3" Max AIR: 4-6% TEST METHOD: ASTM C -39 7 ASTM C -172 05/28/1996 ASTM C -143 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 3.0 1 2 3.0 1 3 3.0 1 4 3.0 CONCRETE CLASS: 8272 PLACEMENT DATE: 04/30/1996 BATCH TIME: 7 :09 aril TIME SAMPLED: 7 :34 am BY: Barry Cuble WEATHER CONDITIONS: Sunny and cool TEMPERATURE (F) - AIR 50 F CONCRETE: 62 F TRUCK NO: 474 TICKETNO: 579867 AIR CONTENT ( %): 5.5% UNIT WEIGHT (pci): N/A PLACEMENT LOCATION: Paving, north of boulevard, station 10+68.82 - 18 +31.36 SAMPLE LOCATION: Station 11+08 ACCUMULATIVE YARDS: 370 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 05/07/1996 7 108560 05/07/1996 7 100360 05/28/1996 28 121420 05/28/1996 28 129120 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3840 3550 4290 4570 Technician: Barry Cuble Started: 6:00 am Finished: 3:00 pm I XA-1 Weering, Inc. Report Distribution: (1) Emerson Partners, Inc. (1) City ofCoppell Eugene Harbour (1) Rust Lichliter /Jameson Vice President (1) Austin Bridge & Road, Inc. 01AS This report is exclusively for the use ofthe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPREsSNE STRENGTH TEST fBC ENGINEERING, W- 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 0413011996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 963179 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples." PROJECT DATA CONTRACTOR: Austin Bridge & Road CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 3" Max AIR: 4-6% TEST METHOD: ASTM C -39 ASTM C -172 ASTM C -143 CONCRETE CLASS: 8272 PLACEMENT DATE: 04/30/1996 BATCH TIME: 10:30 am TIME SAMPLED: 10:49 am BY: Barry Cuble WEATHER CONDITIONS: Sunny, light winds, and mild TEMPERATURE (F) - AIR 62 F CONCRETE: 64 F TRUCKNO: 459 TICKETNO: 580212 AIR CONTENT ( %): 4.8% UNIT WEIGHT (pct): NIA PLACEMENT LOCATION: Paving, north of boulevard, station 10+68.82 - 18 +31.36 SAMPLE LOCATION: Station 14 +70 ACCUMULATIVE YARDS: 370 REPORT OF TESTS CYLINDER MARKED SET NO. MEASURED SLUMP DATE (inches) TESTED AGE (days) FRACTURE TYPE 2 1 2.0 05/07/1996 2 2 2.0 05/07/1996 2 3 2.0 05/28/1996 2 4 2.0 05/28/1996 7 7 28 28 MAXIMUM LOAD (lbs.force) COMPRESSIVE STRENGTH (psi) 89450 90610 107370 109380 3160 3200 3800 3870 Technician: Barry Cuble Started: 6:00 am Finished: 3:00 pm 1 EgWepring, Inc. Report Distribution: (1) Emerson Partners, Inc. (1) City of Copper Eugene Harbour (1) Rust Lichliter /Jameson Vice President (1) Austin Bridge & Road, Inc. 01AS Ibis report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPRESSIVE STRENGTH TEST ENGIN 9MM, W- 4747 Irving Blvd., Suite 4206 Dallas, Texas 75247 Date of Service: 04/30/1996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 963179 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. ** PROJECT DATA CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION STRENGTH: SLUMP: AIR: TEST METHOD: Austin Bridge & Road TXI 41 REQUIREMENTS 3000 psi @ 28 Days 3" Max 4 -6% ASTM C -39 ASTM C -172 ASTM C -143 CONCRETE CLASS: 8272 PLACEMENT DATE: 04/30/1996 BATCH TIME: 12 :45 pm TIME SAMPLED: 1 :14 pm BY: Barry Cuble WEATHER CONDITIONS: Sunny, mild, and light winds TEMPERATURE (F) - AIR 72 F CONCRETE: 66 F TRUCK NO: 474 TICKET NO: 580435 AIR CONTENT( 5.0% UNIT WEIGHT (pct): NIA PLACEMENT LOCATION: Paving, north of boulevard, station 10+68.82 - 18 +31.36 SAMPLE LOCATION: Station 16 +90 FRACTURE TYPE Technician: Barry Cuble Started: 6:00 am Finished: 3:00 pm FDC Engineering. Inc. Report Distribution: (1) Emerson Partners, Inc. (1) City ofCoppell Eugene Harbour (1) Rust Lichliter /Jameson Vice President (1) Austin Bridge & Road, Inc. 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. ACCUMULATIVE YARDS: 370 REPORT OF TESTS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 3 1 2.5 05/07/1996 7 87040 3080 3 2 2.5 05/07/1996 7 92500 3270 3 3 2.5 05/28/1996 28 111130 3930 3 4 2.5 05/28/1996 28 109490 3870 FRACTURE TYPE Technician: Barry Cuble Started: 6:00 am Finished: 3:00 pm FDC Engineering. Inc. Report Distribution: (1) Emerson Partners, Inc. (1) City ofCoppell Eugene Harbour (1) Rust Lichliter /Jameson Vice President (1) Austin Bridge & Road, Inc. 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.