Loading...
ST0001-LR960423CONCRETE COMPRL- DIVE STRENGTH TES _ ENGINEER %, INC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 04/23/1996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 962965 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples." PROJECT DATA CONTRACTOR: Austin Bridge & Road CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 1 - 3 AIR: 4-6% TEST METHOD: ASTM C -39 (Ibs. force) ASTM C -172 2.5 ASTM C -143 CONCRETE CLASS: 8272 PLACEMENT DATE: 04/23/1996 BATCH TIME: 8 :43 am TIME SAMPLED: 8 :54 aril BY: Barry Cuble WEATHER CONDITIONS: Sunny and mild TEMPERATURE (F) - AIR 52 F CONCRETE: 64 F TRUCK NO: 452 TICKET NO: 575368 AIR CONTENT ( %): 4.4% UNIT WEIGHT (pet): N/A PLACEMENT LOCATION: Paving, north side of building, station 10 +68.82 - 18 +31.31 SAMPLE LOCATION: Station 12 +78 ACCUMULATIVE YARDS: 370 COMPRESSIVE _ STRENGTH FRACTURE (psi) TYPE 3740 3850 5030 5370 Technician: Bary Cuble started: 6:00 am Finished: 1:00 pm ngin ering, Inc. Report Distribution: (1) Emerson Partners, Inc. (1) city ofcoppell Eugene Harbour (1) Rust Lichliter /Jameson (1) Austin Bridge & Road, Inc. Vice President 01AS This report is exclusively for the use of thhe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (Ibs. force) 1 1 2.5 04/30/1996 7 105730 1 2 2.5 04/30/1996 7 108840 1 3 2.5 05/21/1996 28 142269 1 4 2.5 05/21/1996 28 151810 Cylinders knocked over on jobsite. COMPRESSIVE _ STRENGTH FRACTURE (psi) TYPE 3740 3850 5030 5370 Technician: Bary Cuble started: 6:00 am Finished: 1:00 pm ngin ering, Inc. Report Distribution: (1) Emerson Partners, Inc. (1) city ofcoppell Eugene Harbour (1) Rust Lichliter /Jameson (1) Austin Bridge & Road, Inc. Vice President 01AS This report is exclusively for the use of thhe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPRE-SIVE STRENGTH TES _ fDC ENGnvmmu, W- 4747 Irving Blvd., Stine #206 Dallas, Texas 75247 Date of Service: 04/23/1996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 962965 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. ** PROJECT DATA CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION STRENGTH: SLUMP: AIR: TEST METHOD: NO. Austin Bridge & Road TXI 41 REQUIREMENTS 3000 psi @ 28 Days 1 " - 3 " 4 -6% ASTM C -39 ASTM C -172 ASTM C -143 ACCUMULATIVE YARDS: 370 CYLINDER MARKED SET 2 2 2 2 MEASURED SLUMP DATE (inches) TESTED CONCRETE CLASS: 8272 PLACEMENT DATE: 04/23/1996 BATCH TIME: 10:18 am TIME SAMPLED: 10:50 am BY: Barry Cuble WEATHER CONDITIONS: Sunny and light winds TEMPERATURE (F) - AIR 59 F CONCRETE: 66 F TRUCK NO: 452 TICKET NO: 575493 AIR CONTENT ( %): 4.2% UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Paving, north side of building, station 10+68.82 - 18 +31.31 SAMPLE LOCATION: Station 14 +58 REPORT OF TESTS AGE (days) 1 1.5 04/30/1996 2 1.5 04/30/1996 3 1.5 05/21/1996 4 1.5 05/21/1996 Technician: Barry Cuble Report Distribution: (1) Emerson Partners, Inc. (1) City of Coppell (1) Rust Lichliter /Jameson (1) Austin Bridge & Road, Inc. 7 7 28 28 135980 4810 130320 4610 168770 5970 166230 5880 FRACTURE TYPE Started: 6:00 am Finished: 1:00 pm ngi ering, Inc. Eugene Harbour Vice President MAXIMUM LOAD - (Ibs. force) COMPRESSIVE STRENGTH (psi) 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPRE. SIVE STRENGTH TES _ UqGMU»,RC 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 04/23/1996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 962965 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. ** PROJECT DATA CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION STRENGTH: SLUMP: AIR: TEST METHOD: Austin Bridge & Road TXI 41 REQUIREMENTS 3000 psi @ 28 Days 1 11 - 3 1' 4 -6% ASTM C -39 ASTM C -172 ASTM C -143 CONCRETE CLASS: 8272 PLACEMENT DATE: 04/23/1996 BATCH TIME: 11 :50 pm TIME SAMPLED: 12 :15 pm BY: Barry Cuble WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 382 AIR CONTENT ( %): 5.1 % PLACEMENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS CYLINDER MARKED SET 3 3 3 3 NO. MEASURED SLUMP DATE (mches) TESTED 1 4.0 04/30/1996 2 4.0 04/30/1996 3 4.0 05/21/1996 4 4.0 05/21/1996 Technician: Barry Cuble Report Distribution: (1) Emerson Partners, Inc. (1) City of Coppell . (1.) Rust Lichliter /Jameson (1) Austin Bridge & Road, Inc. Sunny, mild, light winds 62 F CONCRETE: 66 F TICKET NO: 575621 UNIT WEIGHT (pct): N/A Paving, north side of building, station 10+68.82 - 18 +31.31 Station 17 +70 370 FRACTURE TYPE Started: 6:00 am Finished: 1:00 pm n in ri Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (Ibs, force) (psi) 7 103190 3650 7 106300 3760 28 126930 4490 28 132870 4700 FRACTURE TYPE Started: 6:00 am Finished: 1:00 pm n in ri Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.