Loading...
ST0001-LR960423 (2)CONCRETE COMPRE...IVE STRENGTH TES's fir ENGINEERING, INC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 0412311996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 962965 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive Strength samples." PROJECT DATA CONTRACTOR: Austin Bridge & Road CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 1" - 3" AIR: 4-6% TEST METHOD: ASTM C -39 (inches) ASTM C -172 (lbs. force) ASTM C -143 CONCRETE CLASS: 8272 PLACEMENT DATE: 04/23/1996 BATCH TIME: 8:43 ant TIME SAMPLED: 8:54 am BY: Barry Cuble WEATHER CONDITIONS: Sunny and mild TEMPERATURE (F) - AIR 5 2 F CONCRETE: 64 F TRUCKNO: 452 TICKETNO: 575368 AIR CONTENT ( %): 4.4% UNIT WEIGHT (pc* N/A PLACEMENT LOCATION: Paving, north side of building, station 10+68.82 - 18 +31.31 SAMPLE LOCATION: Station 12 +78 ACCUMULATIVE YARDS: 370 Cylinders knocked over on jobsite. FRACTURE TYPE Technician: Barry Cuble Started: 6:00 ant Finished: 1:00 pm lirglinginiring, Inc. Report Distribution: (1) Emerson Partners, Inc. —/ (1) Cit ofCoppell Eugene Harbour (1) Rust Lichliter /Jameson Vice President (1) Austin Bridge & Road, Inc. 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc REPORT OF TESTS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 2.5 04/30/1996 7 105730 3740 1 2 2.5 04/30/1996 7 108840 3850 1 3 2.5 05/21/1996 28 1 4 2.5 05/21/1996 28 Cylinders knocked over on jobsite. FRACTURE TYPE Technician: Barry Cuble Started: 6:00 ant Finished: 1:00 pm lirglinginiring, Inc. Report Distribution: (1) Emerson Partners, Inc. —/ (1) Cit ofCoppell Eugene Harbour (1) Rust Lichliter /Jameson Vice President (1) Austin Bridge & Road, Inc. 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc CONCRETE COMPREk- -AVE STRENGTH TES' ENGIMMRM, WC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 0412311996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Report No.: 962965 Project No.: 43- 1220 -96 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. ** PROJECT DATA CONTRACTOR: Austin Bridge & Road CONCRETE CLASS: 8272 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 04/23/1996 BATCH TIME: 10:18 am PLANT: 41 TIME SAMPLED: 10:50 am BY: Barry Cuble SPECIFICATION STRENGTH: SLUMP: AIR: TEST METHOD: REQUIREMENTS 3000 psi @ 28 Days 1 11- 3 11 4 -6% ASTM C -39 ASTM C -172 ASTM C -143 WEATHER CONDITIONS: Sunny and light winds TEMPERATURE (F) -AIR 59 F CONCRETE: 66 F TRUCKNO: 452 TICKETNO: 575493 AIR CONTENT (" /o): 4.2% UNIT WEIGHT (pef): N/A PLACEMENT LOCATION: Paving, north side of building, station 10+68.82 - 18 +31.31 SAMPLE LOCATION: Station 14 +58 ACCUMULATIVE YARDS: 3 70 REPORT OF TESTS CYLINDER MARKED SET NO. 2 1 2 2 2 3 2 4 MEASURED SLUMP DATE AGE (inches) TESTED (days) 1.5 04/30/1996 7 1.5 04/30/1996 7 1.5 05/21/1996 28 1.5 05/21/1996 28 Technician: Barry Cuble Report Distribution: (1) Emerson Partners, Inc. (1) City of Coppell (1) Rust Lichliter /Jameson (1) Austin Bridge & Road, Inc. MAXIMUM LOAD Ohs. force) 135980 130320 COMPRESSIVE STRENGTH FRACTURE (Psi) TYPE 4810 4610 Started: 6:00 am Finished: 1:00 pm eeri ' )( riC. ugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPRE. 31VE STRENGTH TES , fBC ENGINEERING, INC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 04/23/1996 Client No.: 23615000 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Project: Creekview Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. ** PROJECT DATA CONTRACTOR: Austin Bridge & Road CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 1 11 - 3" AIR: 4-6% TEST METHOD: ASTM C -39 ASTM C -172 ASTM C -143 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 3 1 4.0 3 2 4.0 3 3 4.0 3 4 4.0 CONCRETE CLASS: 8272 PLACEMENT DATE: 04/23/1996 BATCH TIME: 1 1:50 pm TIME SAMPLED: 12:15 pm BY: Barry Cuble WEATHER CONDITIONS: Sunny, mild, light winds TEMPERATURE (F) -AIR 62 F CONCRETE: 66 F TRUCKNO: 382 TICKETNO: 575621 AIR CONTENT ( %): 5.1 % UNIT WEIGHT (pct): N/A PLACEMENT LOCATION: Paving, north side of building, station 10 +68.82 - 18 +31.31 SAMPLE LOCATION: Station 17 +70 ACCUMULATIVE YARDS: 370 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (Ibs. force) 04/30/1996 7 04/30/1996 7 05/21/1996 28 05/21/1996 28 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 103190 3650 106300 3760 Technician: Barry Cuble Started: 6:00 am Finished: 1:00 pm ngi ering, Inc. Report Distribution: (1) Emerson Partners, Inc. (1) City of Copper Eugene Harbour (1) Rust Lichliter /Jameson Vice President (1) Austin Bridge & Road, Inc. Report No.: 962965 Project No.: 43- 1220 -96 01AS This report is exclusively for the use ofthe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc