ST0001-LR960422REPORT OF CONCRL 'E INSPECTION
ENGINEERING, W
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
Date of Service: 04/22/1996
Client No.: 23615000
Report No.: 962930
Project No.: 43- 1220 -96
Client: Emerson Partners, Inc.
Mr. Jim McElroy
4516 Lovers Lane, Suite 197
Dallas TX 75225
Services: Concrete inspection.
Project: Creekview Drive
Coppell, Texas
On this date, an HBC technician arrived at the above jobsite as scheduled.
Concrete placement was cancelled after the technician's arrival due to wet
weather conditions.
Technician: Barry Cuble
Report Distribution:
(1) Emerson Partners, Inc.
(1) City of Coppell
(1) Rust Lichliter /Jameson
(1) Austin Bridge & Road, Inc.
no ee ' g, Inc.
Paul D. Smith, P.E.
Senior Project Engineer
99AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering,