Loading...
ST0001-LR960422REPORT OF CONCRL 'E INSPECTION ENGINEERING, W 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 04/22/1996 Client No.: 23615000 Report No.: 962930 Project No.: 43- 1220 -96 Client: Emerson Partners, Inc. Mr. Jim McElroy 4516 Lovers Lane, Suite 197 Dallas TX 75225 Services: Concrete inspection. Project: Creekview Drive Coppell, Texas On this date, an HBC technician arrived at the above jobsite as scheduled. Concrete placement was cancelled after the technician's arrival due to wet weather conditions. Technician: Barry Cuble Report Distribution: (1) Emerson Partners, Inc. (1) City of Coppell (1) Rust Lichliter /Jameson (1) Austin Bridge & Road, Inc. no ee ' g, Inc. Paul D. Smith, P.E. Senior Project Engineer 99AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering,