Loading...
ST0001-LR960320REPORT OF IN -PLACE DENSITY TESTS fBC ENGWEE ZeU, INC. 4747 Trying Boulevard, Suite 206 Dallas, Texas 75247 Client: Emerson Partners, Inc. Date: 3/20/96 Project No. 43- 1220 -96 Project: Creekview Drive Report No. 961953 Coppell, Texas Client No. Page: 1 of 2 Laboratory Test Method: ASTM D -698 M/D No. Material Description 1 Dark To Medium Brown And Tan Sandy Clay With Limestone Optimum Moisture Density Requirement % (PCF) Moist Density___ 29.5% 89.0 95% Field Test Method: ASTM D -2922 / D -3017 FIELD DENSITY TEST M/D Moisture Test No Test Location No. % 1 Sta. 3 +00, 8" sanitary sewer, 10 ft. below 1 29.1 ground level 97.1 2 Sta. 3 +00, 8" sanitary sewer, 8 ft. below 1 29.3 ground level 97.8 3 Sta. 3 +00, 8" sanitary sewer, 6 ft. below 1 30.4 ground level 98.9 4 Sta. 3 +00, 8" sanitary sewer, 4 ft. below ground level 5 Sta. 3 +00, 8" sanitary sewer, 2 ft. below ground level 6 Sta. 3 +00, 8" sanitary sewer, ground level 7 Sta. 6 +00, 8" sanitary sewer, 10 ft. below ground level Complies except where noted (*). Dry Density Density (PCF) % 1 29.0 86.0 96.6 1 29.1 86.4 97.1 1 29.4 88.0 98.9 1 29.3 87.0 97.8 1 29.9 89.0 100.0 1 30.4 88.0 98.9 1 30.5 84.8 95.3 on REPORT OF IN -PLACE DENSITY TESTS f I ENGWEERING, INC. 4747 Irving Boulevard, Suite 206 Dallas, Texas 75247 Client: Emerson Partners, Inc. Date: 3/20/96 Project No. 43- 1226 -96 Project: Creekview Drive Report No. 961953 Coppell, Texas Client No. Laboratory Test Method: ASTM D -698 Page: 2 of 2 M/D No. Material Description 1 Dark To Medium Brown And Tan Sandy Clay With Limestone Field Test Method: ASTM D -2922 / D -3017 FIELD DENSITY TEST M/D Moisture Test No. Test Location No. % 8 Sta. 6 +00, 8" sanitary sewer, 8 ft. below 96.4 ground level 9 Sta. 6+00, 8" sanitary sewer, 8 ft. below 1 29.6 ground level 10 Sta. 6+00, 8" sanitary sewer, 6 ft. below 88.2 ground level 11 Sta. 6 +00, 8" sanitary sewer, 2 ft. below 99.0 ground level 12 Sta. 6 +00, 8" sanitary sewer, ground level 13 6" stub -out cross over sanitary sewer - center, 97.1 4 ft. below ground level 14 6" stub -out cross over sanitary sewer - center, 2 ft. below ground level 15 6" stub -out cross over sanitary sewer - center, ground level Complies except where noted ( *). Technician: T. Morgan Time: 4:30 pm to 7:00 pm Optimum Moisture Density Requirement % (PCF) Moisture Density 29.5% 89.0 95% Dry Density Density (PCF) % 1 30.2 85.8 96.4 1 29.8 86.2 96.9 1 29.6 87.3 98.1 1 30.4 88.2 99.1 1 30.5 88.1 99.0 1 29.6 85.8 96.2 1 28.5 86.4 97.1 1 30.1 87.6 98.4 HBC ENGINEERING, INC. Report Distribution: (1) Emerson Partners, Inc. (1) City of Coppell (1) Rust Lichliter /Jameson Paul D. Smith, P.E. (1) Austin Bridge & Road, Inc. 404CC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc