Loading...
ST0001-LR960320 (3)REPORT OF IN -PLACE DENSITY TESTS M/D fDC Dry Density Density test No. ENGINEERING, INC. No. % (PCF) 4747 Irving Boulevard, Suite 206 1 8" sanitary sewer, station 1 +00, 4 ft. belo Dallas, Texas 75247 Client: Site Concrete, Inc. Date: 3/20/96 1 18.0 Project No. 43- 1222 -96 Project: Town Center 8" sanitary sewer, station 1 +00, 2 ft. below Report No. 961948 Coppell, Texas Client No. ground level Laboratory Test Method: ASTM D -698 18.1 Page: 1 of 1 3 Optimum M/D No. Mat Description Moisture % Density (PCF) Requirement Moisture ensity 1 961949 Reddish To Medium Brown Sandy Clay 106.5 99.5 With Gravel 17.5% 107.0 95% Field Test Method: ASTM D -2922 / D -3017 FIELD DENSITY TEST :omplies except where noted ( *). echnician: T. Morgan ime: 12:30 pm to 1:30 pm eport Distribution: Site Concrete, Inc. City of Coppell HBC ENGINEERING, INC. Paul D. Smith, P.E. 404CC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. M/D Moisture Dry Density Density test No. Test Location No. % (PCF) %, 1 8" sanitary sewer, station 1 +00, 4 ft. belo ground level 1 18.0 106.3 99.3 2 8" sanitary sewer, station 1 +00, 2 ft. below ground level 1 18.1 105.5 98.6 3 8" sanitary sewer, station 1 +00, ground level 1 18.7 106.5 99.5 :omplies except where noted ( *). echnician: T. Morgan ime: 12:30 pm to 1:30 pm eport Distribution: Site Concrete, Inc. City of Coppell HBC ENGINEERING, INC. Paul D. Smith, P.E. 404CC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. MOISTURE- DENSITY RELATIONSHIP TEST 100 95 U °- 90 c a� 85 L 0 80 75 1 IT 20 22.5 25 27.5 30 32.5 35 Water content, % Test specification: ASTM D 698 -91 Method A, Standard Elev/ Depth Classification Not. Moist. Sp.G. LL PI % > No.4 % < No.200 USCS AASHTO TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 89.0 pcf Optimum moisture = 29.5 % Dark to Medium Brown Ton Sandy Cloy /Some Limeston Project No.: Project: Creekview Drive Location: Date: 3 -15 -1996 Remarks: Sampled from stockpile for trench backfill F i g . No. 961 849 MOISTURE - DENSITY RELATIONSHIP TEST HBC ENGINEERING, INC