December 18, 1980
Mr. James R. Elium, III
City Administrator
City of Coppel!
P. O. Box 478
Coppell, Texas 75019
Dear Jim:
Thank you for your letter of December 16, 1980, concerning the preliminary
cost breakdown for Esters Road. I am returning a copy of this letter indicating
our acceptance of the formula used for cost distribution and the schedule for the
completion of the improvements.
The only two comments I have with the proposal is the cost of 7% for engineering
design services, as it has been our practice to never have to pay more than 6% for a
job of this size. The other question that I have is the width of the roadway of 22
feet. It has been our practice to install 24 feet back to back.
Again, thanks for your quick response to this issue, and I trust that you will
get concurrence from the other property owners to allow you to proceed as rapidly
as possible with this project.
Yours truly,
Ronald D. Richards/fk~
RDR/kw
Attachment
The City With A Beautiful Fut.ure
P. O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
Office of the City Administrator
JAMES R. ELIUM, III
December 16, 1980
Woodbine Development Corp.
ATTN: Ron Richards
3200 First National Bank Building
Dallas, TX 75202
Project Cost
Less County Funds
Less City Funds
Dear Sir:
This letter is to advise the property owners along Esters Road of the
status of the proposed paving improvements. Since several projects are
now proceeding ahead of schedule the City has taken steps to assure
that Esters Road will be paved to serve these facilities upon there opening
dates.
I am enclosing for your review a letter from the City's consulting engineer
which defines the redesign cost, construction layout cost, project cost and
project schedule. Also enclosed is a copy of a petition signed by the
property owners which has been accepted by the Coppell City Council.
Based upon this'overall concurrence of the property owners and the City,
the following is a preliminary cost breakdown:
Divided Roadway
2 - 22 Foot Lanes - 15 Foot Median
Total Construction Cost $ 1,470,500.
1. = $ 1,470,500.
2. = 300,000.
3. = 300,000.
4. Property Owners Cost
$ 870,500.
20% Cost = To AC.
$174,100.
80% Cost = To Front Footage
$696,400.
Cost For One AC. (283 ac) = $ 615.00
Cost Per Foot (9242') = $ 75.35
Page 2
December 16, 1980
Minyard's
61.5 ac = $
1862 ft =
Total $
Carter
37,835. 57 ac : . $ 35,065.
140,300. , 1862 ft: 140,302.
178,135. Total $ 175,367.
Southern Pacific Southern Pacific
28.4 ac = $ 17,476. 64.5 ac = $ 39,680.
1880 ft = 141,658. 2138 ft = 161,098.
Total $ 159,134. Total $ 200,778.
Troth Woodbine
31.6 ac = $ 19,444. 40 ac = $ 24,616.
1450 ft: 109,258. 50 ft.: 3,768.
Total $ 128,702. Total' $ 28,384.
Please review the information contained herein and advise my office should
you have any questions or comments. Upon the receipt of bids on or about
February 5, 1981, I will revise the cost figures in accordance with the bids
as received. At that time it will be necessary for each property owner to
place on deposit with the City the funds as calculated at that time. If
you are in agreement with the above schedule and cost distribution formula,
please sign in the space provided below and return to my office.
V~ truly yours,
(~/dames R. Fl ium, III City Administrator
Enclosure
APPROVED:
Woodbine Development Corp.