ST7301-CS 801218(2~4) ~4--~000 RONALD ~. RICHARDS VICE PI~LSIO£NT December 18, 1980 Mr. James R. Elium, III City Administrator City of Coppel! P. O. Box 478 Coppell, Texas 75019 Dear Jim: Thank you for your letter of December 16, 1980, concerning the preliminary cost breakdown for Esters Road. I am returning a copy of this letter indicating our acceptance of the formula used for cost distribution and the schedule for the completion of the improvements. The only two comments I have with the proposal is the cost of 7% for engineering design services, as it has been our practice to never have to pay more than 6% for a job of this size. The other question that I have is the width of the roadway of 22 feet. It has been our practice to install 24 feet back to back. Again, thanks for your quick response to this issue, and I trust that you will get concurrence from the other property owners to allow you to proceed as rapidly as possible with this project. Yours truly, Ronald D. Richards/fk~ RDR/kw Attachment The City With A Beautiful Fut.ure P. O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 Office of the City Administrator JAMES R. ELIUM, III December 16, 1980 Woodbine Development Corp. ATTN: Ron Richards 3200 First National Bank Building Dallas, TX 75202 Project Cost Less County Funds Less City Funds Dear Sir: This letter is to advise the property owners along Esters Road of the status of the proposed paving improvements. Since several projects are now proceeding ahead of schedule the City has taken steps to assure that Esters Road will be paved to serve these facilities upon there opening dates. I am enclosing for your review a letter from the City's consulting engineer which defines the redesign cost, construction layout cost, project cost and project schedule. Also enclosed is a copy of a petition signed by the property owners which has been accepted by the Coppell City Council. Based upon this'overall concurrence of the property owners and the City, the following is a preliminary cost breakdown: Divided Roadway 2 - 22 Foot Lanes - 15 Foot Median Total Construction Cost $ 1,470,500. 1. = $ 1,470,500. 2. = 300,000. 3. = 300,000. 4. Property Owners Cost $ 870,500. 20% Cost = To AC. $174,100. 80% Cost = To Front Footage $696,400. Cost For One AC. (283 ac) = $ 615.00 Cost Per Foot (9242') = $ 75.35 Page 2 December 16, 1980 Minyard's 61.5 ac = $ 1862 ft = Total $ Carter 37,835. 57 ac : . $ 35,065. 140,300. , 1862 ft: 140,302. 178,135. Total $ 175,367. Southern Pacific Southern Pacific 28.4 ac = $ 17,476. 64.5 ac = $ 39,680. 1880 ft = 141,658. 2138 ft = 161,098. Total $ 159,134. Total $ 200,778. Troth Woodbine 31.6 ac = $ 19,444. 40 ac = $ 24,616. 1450 ft: 109,258. 50 ft.: 3,768. Total $ 128,702. Total' $ 28,384. Please review the information contained herein and advise my office should you have any questions or comments. Upon the receipt of bids on or about February 5, 1981, I will revise the cost figures in accordance with the bids as received. At that time it will be necessary for each property owner to place on deposit with the City the funds as calculated at that time. If you are in agreement with the above schedule and cost distribution formula, please sign in the space provided below and return to my office. V~ truly yours, (~/dames R. Fl ium, III City Administrator Enclosure APPROVED: Woodbine Development Corp.