Loading...
Willow Park-LR120127 8908 Ambassador Row, Dallas, TX 75247 R one En g i n e e r i n g 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: JR Rose Development Companies Report No.: 405441 2209 Cameron Crossing Project No.: 1116815 Grapevine, TX 76051 Date of Service: 01/19/2012 Report Date: 01/27/2012 Project: Willow Park Townhomes - Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Mix Design I.D.: 1061 Measured Concrete Supplier: Southern Star Placement Date: 01/19/2012 Slump Plant: 110 Weather Conditions: Sunny (inches) Specification Requirements Time Sampled: 02:35pm Batch time: 02:10pm 5.0 Strength: 4,000 psi @ 28 days Temperature - Air: 71°F Concrete: 70 °F Slump (in.): 3" - 5" Truck No: 6235 Ticket No: 1966397 Air ( %): 3% - 6% Air Content: 4.2% Unit Weight (pcf): NA Test Method: ASTM C -172 Overall Placement Location: ASTM C -31 (except 10.1.2) Stamped concrete approach on DaVinci Court and Rembrandt Court ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 Sample Location: ASTM C -1231 Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 01/26/2012 7 6.00 28.27 119,790 4,240 Type 3 1 2 02/16/2012 28 1 3 02/16/2012 28 ' 1 __ mr9 nal m 1 ,,,, ‘1 , , ri 1 .„.„- .. Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 40 ,' Remarks: Water added at site: 10 gallons j 1' Color added on site. Technician: Danny Howard Started: 11:30am Finished: 03:45pm Rone Engineering Report Distribution: Orig: JR Rose Development Companies (Grapevine, TX) Attn: Mr. Jason Rose (1 -ec copy) i 1-ec Rone Project Manager Attn: Mr. Jason Creasy AET 0 1 -ec City of Coppell Attn: Mr. Mike Garza • Jason Creasy, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /JC) Page 1 of 1 8908 Ambassador Row, Dallas, TX 75247 R one E n g i n e e ri n 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Cylinder Collection Client: JR Rose Development Companies Report No.: 405659 2209 Cameron Crossing Project No.: 1116815 Grapevine, TX 76051 Date of Service: 01/23/2012 Report Date: 01/27/2012 Project: Willow Park Townhomes - Coppell, Texas Services: Pick Up Compressive Strength Test Specimens Cast Prior To This Date Report of Collection On this date, a Rone Engineering Services, Ltd. representative arrived on site as scheduled to pick up compressive strength test specimens cast prior to this date. Technician: Bruce Eberts Started: 11:OOam Finished: 12:15pm Rone Engineering Report Distribution: Orig: JR Rose Development Companies (Grapevine, TX) Attn: Mr. Jason Rose (1 -ec copy) 1 -ec Rone Project Manager Attn: Mr. Jason Creasy AET 1 -ec City of Coppell Attn: Mr. Mike Garza Jason Creasy, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (SH /JC) Page 1 of 1