Loading...
ST1002-LR120220FIELD DENSITY TEST REPORT Ir erracon Report Number: 94111246.0040 Service Date: 02/14/12 8901 Carpenter Frwy. Suite 100 Report Date: 02/20/12 Dallas, TX 75247 Task: 214 - 630 -1010 Reg No: F -3272 Client Project City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94111246 Material Information Lab Test Data Project Requirements 278 Optimum Max. Lab Final Water Dry Unit Water Minimum Mat. Proctor Laboratory Content Weight Content Compaction No. Ref. No. Classification and Description Test Method ( %) (pcf) 1 94111246.0038 Dark brown clay ( lime treated) ASTM D698 24.4 95.0 -2/ +4 95 Field Test Data Test No. Test Location Probe Wet Water Water Dry Unit Percent Lift / Mat. Depth Density Content Content Weight Compaction Elev. No. (in) (pcf) (PC ( %) (PC ( %) Datum: Gauge ID: 1469 Comments: Test and /or retest results on this report meet project requirements as noted above. Services: Perform in -place density and moisture content tests to determine degree of compaction and material moisture condition. Terracon Rep.: Christopher Amoah Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Reviewed By: W ,�,z (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Eric J. Cleveland, P.E. (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Senior Project Manager Test Methods: ASTM D6938 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 8- 27 -11, Rev.a Page 1 of 1 Paving 276 Main St., northbound, Sta. 3 +00 Final 1 6 120.9 25.5 26.7 95.4 100 277 Main St., southbound, Sta. 3 +50 Final 1 6 116.8 23.9 25.7 92.9 98 278 Crockett Rd., Sta. 1 +80 Final 1 6 117.8 22.3 23.3 95.5 100+ 279 Burnett Rd., Sta. 1 +75 Final 1 6 117.9 24.8 26.6 93.1 98 280 Burnett Rd., Sta. 3 +50 Final 1 6 115.2 23.8 26.0 91.4 96 281 Houston Rd., Sta. 9 +50 Final 1 6 121.4 25.8 27.0 95.6 100+ 282 Houston Rd., Sta. 6 +00 Final 1 6 118.1 23.2 24.4 94.9 100 Datum: Gauge ID: 1469 Comments: Test and /or retest results on this report meet project requirements as noted above. Services: Perform in -place density and moisture content tests to determine degree of compaction and material moisture condition. Terracon Rep.: Christopher Amoah Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Reviewed By: W ,�,z (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Eric J. Cleveland, P.E. (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Senior Project Manager Test Methods: ASTM D6938 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 8- 27 -11, Rev.a Page 1 of 1