Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST0102-CS030311
Ro =�in GEOTECHNICAL ENGINEERING . GEOLOGICAL STUDIES DISTRESS INVESTIGATIONS • PAVEMENT DESIGN . ADVANCED GEOTECHNICAL TESTING FOUNDATION RECOMMENDATIONS CONSTRUCTION MONITORING CONSTRUCTION MATERIALS TESTING . CONSTRUCTION OBSERVATION . CONCRETE TESTING . ASPHALT TESTING . SOILS TESTING . PIER INSPECTION . POST TENSION INSPECTION . NON - DESTRUCTIVE TESTING STRUCTURAL STEEL INSPECTION . SPECIAL TESTING DRILLING SERVICES . MONITOR WELL INSTALLATION . ENVIRONMENTAL DRILLING . GEOTECHNICAL DRILLING ENVIRONMENTAL CONSULTING . ENGINEERING REMEDIATION . RISK ASSESSMENT . REGULATORY COMPLIANCE LEGAL SUPPORT COMPLIANCE TESTING ENVIRONMENTAL SITE ASSESSMENT ASBESTOS CONSULTING DALLAS 8908 AMBASSADOR ROW DALLAS, TEXAS 75247 TELEPHONE 214- 630 -9745 FACSIMILE 214- 630 -9819 FORT WORTH 2696 GRAVEL DRIVE FORT WORTH, TEXAS 76118 TELEPHONE 817 - 284 -1318 METRO 817 - 429 -4328 FACSIMILE 817 - 284 -1585 March 11, 2003 City of Coppell Ms. Susan Taylor Engineering Department Coppell, TX 75019 Reference: Ruby Road (ST 01 -02) Coppell, TX - 027176 Dear Ms. Taylor, Enclosed with this letter and monthly invoice is a copy of the Budget Report for the noted project. This report represents a detailed summary of the services performed on the project by Rone Engineers. The project totals represent the original estimated budget, amount invoiced to date, and the remaining balance available for our services. If there was no budget established for your project, then the project is considered to be a time and material project and the invoiced amount is the total that has been billed to the project as of this date. Please call (214) 630 -9745 if you have any questions regarding this matter. Sincerely, RONE E N , Ltd. W �' ' 4jk. 0,; Clay Star � C�5 CMT Project Manager Q �� IZ Project No.: 027176 Budget Report Ruby Road (ST 01 -02) Coppell, TX City of Coppell BillCode Description Budget Amount Invoiced _ Remaining Units Units Amount Units Amount 1001 Concrete Technician (hourly) 60.00 1,650.00 30.25 831.88 29.75 818.12 1002 Concrete Technician OT (hourly 0.00 0.00 3.00 123.75 -3.00 123.75 1003 Concrete Test Cylinders (each) 121.00 1,573.00 36.00 468.00 85.00 - 1,105.00 1601 Asphalt Technician (hourly) 4.00 118.00 0.00 0.00 4.00 118.00 2001 Soils Technician (hourly) 72.00 1,980.00 66.25 1,821.88 5.75 158.12 2001C Soils Technician Cancellation 0.00 0.00 7.00 192.50 -7.00 - 192.50 2001R Soils Technician Retesting (Ho 0.00 0.00 4.00 110.00 -4.00 - 110.00 2002 Soils Technician OT (hourly) 0.00 0.00 5.25 216.57 -5.25 - 216.57 2005 In -Place Density Test (each) 171.00 2,223.00 121.00 1,573.00 50.00 650.00 2005R In -Place Density Test (Retesti 0.00 0.00 4.00 52.00 -4.00 -52.00 2007 Pulverizations (each) 9.00 117.00 9.00 117.00 0.00 0.00 2010 Moisture Density Relationship 7.00 910.00 7.00 910.00 0.00 0.00 2020 Atterberg Limits (each) 7.00 280.00 7.00 280.00 0.00 0.00 2040 Gradation Coarse Aggregate (ea 1.00 155.00 0.00 0.00 1.00 155.00 7001 Transportation Charge (trip) 67.00 871.00 44.00 572.00 23.00 299.00 7001C Transportation Charge (Trip) C 0.00 0.00 3.00 39.00 -3.00 -39.00 7001R Transportation Charge (Trip) R 0.00 0.00 2.00 26.00 -2.00 -26.00 7002 Engineering & Report Review 24.40 1,342.00 17.40 957.00 7.00 385.00 7002C Engineering and Report Review 0.00 0.00 0.90 49.50 -0.90 -49.50 7002R Engineering & Report Review Re 0.00 0.00 0.60 33.00 -0.60 -33.00 Project totals: 11 219.00 8,373.08 2,845.92 Jun 6, 03 4:15pm Page I