SS9402C-AG000222AGENDA RL.JUEST FORM 7 �The 70tyWlt�h A Beautiful Future CITY COUNCIL MEETING: February 22, 2000 ITEM # ITEM CAPTION: Consider approval of Change Order #1 for the Bethel Road Reconstruction Project SS 94 -02CST in the amount of $93,960 to Pavecon, Inc.; and authorizing the Mayor to sign. APPROVED BY CITY COUNCIL DATE 2 -z2 -on SUBMITTED BY: Kenneth M. Griffin, P.E. TITLE: Director of Engineering /Public Works STAFF COMMENTS: See attached memo. BUDGET AMT. $ AMT. EST. $ +\ -BID $ FINANCIAL COMMENTS: Funds for this change order are being provided by the property owner. i e S DIR. INITIALS: �� FIN. REVIEW: CITY MANAGER REVIEW: Agenda Request Form - Revised 1/99 Document Name #02221 , MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Mayor and City Council From: Ken Griffin, P.E., Dir. of Engineering /Public Works Date: February 22, 2000 7 RE: Consider approval of Change Order #1 for the Bethel Road Reconstruction Project SS 94 -02CST in the amount of $93,960 to Pavecon, Inc.; and authorizing the Mayor to sign. During the reconstruction of the trench line along the south side of Bethel Road, the City of Coppell was contacted by the owner of the property at the northeast corner of Royal Lane and Bethel Road. The initial inquiry was to ascertain whether or not the City of Coppell would allow truck traffic on Bethel Road once the reconstruction was completed. After the property owner was informed that truck traffic would not be allowed on Bethel Road, they then inquired whether or not the City would allow the property owner to fund a road surface that would allow truck traffic. The property owner was informed that if it fit our timetable that we would allow the property owner to fund the reconstruction of Bethel Road that would allow truck traffic. After conversations with the contractor and the determination that the minimum section would be an 8" stabilized base with a 6" hot mix overlay, the property owner to the north stated that they would fund the additional costs. On February 4, 2000, I provided a letter to the property owner stating that if they paid for the reconstruction of Bethel Road for approximately 870 feet east of the Royal/Bethel intersection, then the City would allow truck traffic up to that point. While no plans have been submitted for the development on the north side of the roadway, the property owners initial layouts indicate that once developed it is highly likely there would be a driveway approximately 870 feet east of Royal Lane on Bethel Road. This location aligns with a drive approach to the Bulk Postal Facility on the south side of the roadway. The cost to reconstruct 870 feet of Bethel Road is $93,960. A commitment letter was provided on February 8, 2000 stating that the property owner would make payment to the City of Coppell in the amount of the understanding that truck traffic would be allowed on that section of Bethel Road. On February 1960 2000, with the property owner to the north provided a check to the City of Coppell in the amount of $93,960 for the reconstruction of Bethel Road for approximately 870 feet east of Royal Lane. Again, the reconstruction will be 8 inches of subgrade material, with 6 inches of hot mix. This is a typical roadway section which should hold up under truck traffic until the road is reconstructed to its permanent configuration. You may recall that this is one of the roads approved in the November 1999 Bond Election by the citizens of Coppell. Because the entire change order has been paid by the property owner to the north at no cost to the City and because of the City's desire to expedite the construction and proceed with this project, the City of Coppell has instructed the contractor to proceed with this work. Therefore, the City anticipates this project will still be completed within the initial timeframe i.e., toward the end of February or the first week of March. Staff recommends approval of Change Order #1 to the Bethel Road Reconstruction Project in the amount of $93,960. Staff will be available to answer any questions at the Council meeting. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT.- BETHEL ROAD RECONSTRUCTION PROJECT SS94 -02C ST CONTRACTOR. PAVECON, Inc. OWNER: CITY OF COPPELL CHANGE ORDER: #1 DATE: 219100 ADD: Item Quantity Unit Description Unit Price Total Price 1 2,320 SY Full depth asphalt paving for approximately 40.50 93,960.00 870 feet east of the intersection of Royal Lane with Bethel Road. The 870 feet will terminate immediately east of the western most driveway the Bulk Postal Facili Total Addition 93,960.00 TOTAL CHANGE ORDER #1 $93,960.00 Previous Contract Amount Total Change Order #1 Revised Contract Amount Net Increase in Contract Date of Completion $221,461.00 $93,960.00 $315,421.00 N/A The contractor hereby accepts tb�s contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future :lability originating under any clause in the Contract by reason for this revision to the Contract. Agreed to b ontractor Date Recommend d 1 City Engineer Date Proposal and Contract CITY OF COPPELL P.O.BOX 478 COPPELL, TEXAS 75019 -4409 February 4, 2000 Tele: (972)304 -3685 Attn: GARRETH CAMPBELL Fax: (972- 304 -3570 PAVECON, INC. offers to furnish all labor, materials and equipment required for the performance of the following described work in connection with construction or improvements at above address. REBUILDING A SECTION OF BETHEL ROAD IN COPPELL The work is to be performed as follows: EXCAVATE APPROX. 14" DEEP, PLACE 8" CTB BASE, PLACE 4" TY "B" BASE ASPHALT AND PLACE 2" TY "D" SURFACE MIX. APPROXIMATLY 2,320 SY @ $40.50 PER SQUARE YARD = $ 93,960.00 Owner shall be responsible to locate all buried utilities lines and sub structures, and to clearly identify and mark all lines and sub structures, by calling 1 800 - DIG -TESS prior to commencement of the work by PCM. By accepting this proposal, Owner agrees to indemnify and to hold PCM harmless from all claims, including its reasonable attorneys' fee incurred in defending any claim, resulting from damages to any utility line or sub structure not identified or clearly marked. If owner shall clearly mark all utility lines or sub structures and such lines or sub structures are damaged by PAVECON, INC. PAVECON shall assume responsibility for all repair costs associated with any damage to such buried items. Cost of City permits (if applicable) are not included in total cost and will be paid by owner. If the foregoing meets with your acceptance, kindly sign and return the attached copy of our proposal. Upon its acceptance it is understood that the foregoing, including the terms and conditions set forth and attached hereto and incorporated herein for all purposes, will constitute the full and complete agreement between us. ACCEPTED: PAVECON, INC. By wig t Smith DS807 3022 ROY ORR BLVD. • GRAND PRAIRIE, TX 75050 • 972- 263 -3223 • FAX 972 - 263 -6551 • www.pavecon.com January 17, 2000 Mr. Garreth Campbell City of Coppell Engineering Department P. O. Box 478, 255 Parkway Blvd. Coppell, Texas 75019 Proposal P689 Re: Cost estimate for providing construction materials testings on the Bethel Road reconstruction from Royal Lane to Freeport Parkway. Dear Mr. Campbell, Soiltech Engineering and Testing, Inc. is pleased to provide you with an estimated cost for providing materials testing services at the above referenced project. The types of tests as well as the quantities you provided in our meeting on January 25, 2000. We appreciate you using our firm on this project. Soiltech Engineering and Testing Inc. will provide qualified technicians and all necessary equipment to complete the testing you require. Attached is a list of the testing per your directives in our meeting. SOILT,ECH ENGINEERING AND TESTING, INC. r, es M. Perdue General Manager 2502 Gravel Drive • Fort Worth, Texas 76118 • 817.595.0064 telephone • 817.589.7279 metro • 817.595.0708 fax S dtech ENGINEERING & TESTING, INC. Soils Description Unit Cost Quantity Dollar Amounts Moisture/ Density Relationship of $120.00 ea. 4 $480.00 Soils ASTM D698 Atterberg Limits (Plasticity Index) $45.00 ea. 4 $180.00 In -Place Density test by Nuclear $17.50 ea. 140 $2450.00 Method (minimum 3 per trip to site) Technician Time (minimum 2 $29.50 ea. 100 $2950.00 hours per trip) Estimated Total $6060.00 Notes: 1. Technician's hours will be invoiced portal to portal. 2. All hours worked in excess of 8 hours per day, Monday through Friday, and all day Saturday will be 1.5 times the normal hourly rate. All work performed before 7:00 A.M. and after 5:00 P.M. will be invoiced at 1.5 times the normal hourly rate. 3. All work performed on Sunday or recognized Holidays will be invoiced at 2.0 times the normal hourly rate. 4. Any additional testing requested but not contained in this proposal will be invoiced on Soiltech Engineering and Testing, Inc. current fee schedule. SOILTECH ENGINEP AND TESTING, INC. n By: Name: Va4s Perdue Title: General Man CLIENT: By: Name: Its authorized officer or aaent Title: v �`/ Its authorized officer or agent 2502 Gravel Drive • Fort Worth, Texas 76118 • 817.595 0064 telephone . 817.589.7279 metro . 817.595.0708 fax