Loading...
SS9402C-AG 991214 (3)7 ® AGENDA RL UEST TN � C�L FORM With A BeautltW Future Y COUNCIL MEETING: December 14, 1999 ITEM # ITEM CAPTION: Declare an emergency and consider approval of awarding a contract to Pavecon, Inc. for the removal, recompaction and repaving of south side of Bethel Road generally from Freeport Parkway to Royal Lane in an amount not to exceed $221,461 as authorized in the 1999 -2000 Budget; and authorizing the Mayor to sign. A PPR o vED - - 6Y CIT COUNCIL SUBMITTED : Kenneth M. Griffin, E. DA, T E TITLE: Director of ering /Public Works STAFF COMMENTS: Pavecon, Inc. has submitted a proposal to remove, recompact and replace the asphalt pavement on Bethel Road. This proposal includes the repair of the subgrade and asphalt paving that has failed over the top of the sanitary sewer line that was installed in 1997. On the prior project, between Grapevine Creek and Freeport, the City used Dallas County to remove and replace the asphalt. We have been dealing with the county to perform the same services on this project. They had originally stated that they could perform the work in November. However, they have now stated that it will be February or later before they could perform the work. Because of that timeline, we have chosen to have the same contractor perform all the work. With your approval of this contract and consideration of the closing of Bethel Road between Freeport Parkway and Royal Lane this work could be completed in approximately two months. Staff will be available to answer questions at the Council meeting. BUDGET AMT. $ AMT. EST. $ FINANCIAL COMMENTS: +\ -BID $ Funds were budgeted in Combined Services in the amount of $200,000. Any excess will be provided by undesignated fund balance. 4 DIR. INITIALS: Yy► FIN. REVIEW* CITY MANAGER REVIEW: ' Agenda Request Form - Revised 2/99 Document Name: #9912142 Wc ���� Proposal and Contract City of Coppell 255 Parkway Coppell, Texas 75019 -4409 November 24, 1999 Tele: (972) 462 -0022 Attn: Ken Griffin, P.E. Fax: (972) 304 -3570 PAVECON, INC. offers to furnish all labor, materials and equipment required for the performance of the following described work in connection with construction or improvements at above address. Pavement improvements: The work is to be performed as follows: Item 1: Remove the existing material in the half of the roadway that Has the failures (approx. 3,400 if x 12.5) to a depth of 3 feet (approx. 4,722 sy) . Additional grade variation to be determined by Engineer and billed by unit price. 4,722 S.Y. @ $8.84/ CY = $41,742.48 Item 2: Fabric under liner at the ditch level 4,722 S.Y. @ $1.01 /S.Y. _ $4,722.00 Item 3: Recompaction of existing or imported material to 100% Density. 4,722 S.Y. @$15.75/S.Y. = $74,371.50 Item 4: Imported fills material (select) as directed. Item 5: Flowable fill as directed. @$15.00 C.Y. (Truck Measure) @$150.00 C.Y. Item 6: 2" HMAC Overlay of the half of the road. 4,722 S.Y. @$5.27/ S.Y. = $24,884.94 Item 7: Recycle the existing CTB and Asphalt by A)Grinding and hauling the material to a stockpile, B) After the subgrade has been repaired haul back to the the roadway the ground up material, C) Place 6% cement in the top 8 inches (53# /S.Y.) 4,722 S.Y @ $16.04/ S.Y. = $75,740.88 3022 ROY ORR BLVD. • GRAND PRAIRIE, TX 75050 • 972 - 263 -3223 • FAX 972- 263 -6551 • www.pavecon.com o� a� Owner shall be responsible to locate all buried utilities lines and sub structures, and to clearly identify and mark all lines and sub structures, by calling 1- 800 - DIG -TESS prior to commencement of the work by PC4. By accepting this proposal, Owner agrees to indemnify and to hold PCM harmless from all claims, including its reasonable attorneys' fee incurred in defending any claim, resulting from damages to any utility line or sub structure not identified or clearly marked. If owner shall clearly mark all utility lines or sub structures and such lines or sub structures are damaged by PAVECON, INC. PAVECON shall assume responsibility for all repair costs associated with any damage to such buried items. Cost of City permits (if applicable) are not included in total cost and will be paid by owner. If the foregoing meets with your acceptance, kindly sign and return the attached copy of our proposal. Upon its acceptance it is understood that the foregoing, including the terms and conditions set forth and attached hereto and incorporated herein for all purposes, will constitute the full and complete agreement between us. PAVECON, INC. By -) - ) (.4�(- C Dw ght Smith DS791 3022 ROY ORR BLVD. • GRAND PRAIRIE, TX 75050 • 972 - 263 -3223 • FAX 972 - 263 -6551 . www.pavecon.com O 0 0 CN II L;j ch W LLI 0 z tL E:l Uj Ld I w o LJ M M ry I �— LL- >- < Z F--q z r M LLJ � �— LLJ z CY < F- Z U 0 LLI < Cy pq 3 LLJ < LLI Ld I :D :r 0 y < C3 F-- 1:3 � LJ LAJ -J < 0 P PCI u CL F - < 1 1� LLI 1:3 _j Lj > < Lli LL- p C3 Z Lli p:l Z LD L El Ld 0 F- 0 0- u Li El EY of t-q tL fq W LLI 0 z tL E:l Uj Ld I w o LJ M M ry I �— LL- >- < Z F--q z r M LLJ � �— LLJ z CY < F- Z U 0 LLI < Cy pq 3 LLJ < LLI Ld I :D :r 0 y < C3 F-- 1:3 � LJ LAJ -J < 0 P PCI u CL F - < 1 1�