Loading...
ST7301-CS 740701COMMISSION REAGAN HOUSTON, CHAIRMAN DEWITT C. GREER CHARLES E. SIMONS Control 2374-6 S.H. Loop 635: Dallas County TEXAS hIGhWaY DEPARTMENT P.0. Box 3067 Dallas, Texas 75221 July 1, 1974 At Proposed Esters Road STATE HIGHWAY ENGINEER B. L. DEBERRY IN REPLY REFER TO FILE NO. Mayor Hulen A. Scott City of Coppell P.O. Box 478 Coppell, Texas 75019 Dear Mayor Scott: Reference is made to your letter of March 22, 1974, concerning the designation of Esters Road from State Highway ll4 to Sandy Lake Road as a thoroughfare and requesting that the Highway Department aid you in implementing the existing Land Use and Thoroughfare Plan by constructing a grade separation inter- change at the intersection of Loop 635 and Esters Road. Attached is a schematic layout on which we have indicated a possible interchange layout for the intersection of Loop 635 and proposed Esters Road. The location for this intersection was determined by a straight north extension of existing Esters Road at S.H. ll4. Your specific review and concurrence of this proposed location of Esters Road is requested as any change in this location will necessitate a re-study of the interchange design. In order'for us to seek approval from our Austin Administration for this additional interchange, we must have a firm commitment by a resolution from Dallas County and the Cities of Irving and Coppell concerning the following items: 1. All right-of-way, including adjustment of utilities, required for the interchange and grade separation approaches will be provided at no cost to the State. 2. Acceptance of interchange design prior to submission to Austin for approval. Mayor Hulen A. Scott July l, 1974 Page 2 Upon receipt of resolutions from Dallas County and the Cities of Irving and Coppell indicating favorable acceptance of the above provisions we will proceed with further development of this project. However, it should be pointed out tha~ actual construc- tion of this grade separation interchange will not be initiated until such time that a usable section of the proposed Esters Road thoroughfare is completed or under construction to be com- pleted at the same time as the interchange project. Also construc- tion of the grade separation interchange project will be dependent on the availability of State and Federal funds. In the event there is a delay in the construction of Loop 635 the Highway Department would have no objection to the County or the Cities constructing Esters Road across the existing Loop 635 right-of-way. If we can be of any further assistance in this matter, please call on us. Yours v_ery trul~y, J/John G. Keller ~/ District Engineer Attachment cc: Judge W.L. Sterrett Mayor R. Dan Matkin