ST9902-BD111130-3800
817-401--341-1707 FAX
November 30, 2011
Mr. Keith Marvin, P.E.
City of Coppell
Engineering Department
255 Parkway Blvd.
Coppell, Texas 75019
RE: West Sandy Lake Road Sidewalk
Dear Mr. Marvin:
Per your request, Laughley Bridge & Construction, Inc. is pleased to quote the following project
referenced-above.
1. Excavate existing sidewalk and replace with
4-in concrete sidewalk with reinforced steel: $4.50 per SF
2. Excavate existing sidewalk and replace with
4-in concrete sidewalk without reinforced steel: $4.00 per SF
Please do not hesitate to call if you have any questions or comments.
Sincerely,
Charles E. Laughley
Laughley Bridge & Construction, Inc. (LBC)
LAUGHLEY BRIDGE & CONSTRUCTION, INC. (LBC) IS A CERTIFIED D/MBE CONTRACTOR PER NCTRCA.
(2/28/2012) Keith Marvin - Fwd: Sidewalk BidPage 1
From:
Albert Samaniego
To:
Marvin, Keith
Date:
11/18/2011 3:08 PM
Subject:
Fwd: Sidewalk Bid
>>> <claughley@laughleybridge.com> 11/18/2011 11:45 AM >>>
Albert:
Per your request:
1. Excavate existing sidewalk & replace with 4" concrete sidewalk with
reinforced steel: $4.50 per SF
2. Excavate existing sidewalk & replace with 4" concrete sidewalk
without reinforced steel: $4.00 per SF
If this is acceptable, then I can put it on our company letter head if
need be.
Thank You,
Charles
.