Loading...
ST0301-AG120228 City of Coppell, Texas 255 Parkway Boulevard C O P P E L L Coppell 7501 -9478 Master File Number: 2012 -0381 File ID: 2012 -0381 Type: Agenda Item Status: Passed Version: 1 Reference: In Control: Engineering File Created: 02/20/2012 File Name: Contract Amendment #6 Bethel & Coppell Road Final Action: 02/28/2012 Title: Consider approval of Contract Amendment Number 6 in the amount of $74,785.00 to the Freese and Nichols, Inc. design contract to the Bethel Road and Coppell Road Improvements contract; and authorizing the City Manager to sign any necessary documents. Notes: Agenda Date: 02/28/2012 Agenda Number: 13. Sponsors: Enactment Date: Attachments: Contract amendment #6 Bethel - Coppell Road Enactment Number: Memo.pdf, Contract amendment #6 Bethel - Coppell Exhibit.pdf, Contract amendment #6 Bethel - Coppell Road- Amendment.pdf Contact: Hearing Date: Drafter: Effective Date: History of Legislative File Ver- Acting Body: Date: Action: Sent To: Due Date: Return Result: sion: Date: 1 City Council 02/28/2012 Approved Pass Action Text: A motion was made by Councilmember Brianna Hinojosa - Flores, seconded by Councilmember Tim Brancheau, that this Agenda Item be Approved . The motion PASSED by an unanimous vote. Text of Legislative File 2012 -0381 Title Consider approval of Contract Amendment Number 6 in the amount of $74,785.00 to the Freese and Nichols, Inc. design contract to the Bethel Road and Coppell Road Improvements contract; and authorizing the City Manager to sign any necessary documents. Summary Executive Summary: This contract amendment will allow Freese and Nichols, Inc. to complete the design of the City of Coppell, Texas Page 1 Printed on 3/5/2012 Master Continued (2012 -0381) final portion of Bethel Road between Coppell /Mitchell and Penfolds Lane. This will also complete the design of the remainder of Coppell Road between Bethel Road and Cooper Lane. Fiscal Impact: Funds are available in the 2011 Street CIP account for this contract amendment Staff Recommendation: Staff recommends approval of the Contract Amendment Number 6. Goal Icon: City of Coppell, Texas Page 2 Printed on 3/5/2012 T H E • C 1 T Y • O F COPPELL 1 lA O F • q X A 8 1 8 MEMORANDUM TO: Mayor and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM: Keith R. Marvin, P.E., Project Engineer DATE: February 28, 2012 RE: Consider approval of Contract Amendment Number 6 in the amount of $74,785.00 to the Freese and Nichols, Inc. design contract to the Bethel Road and Coppell Road Improvements contract; and authorizing the City Manager to sign any necessary documents. At the May 27, 2003 Council meeting, Council awarded a design contract to Freese & Nichols, Inc. for the design of improvements to Bethel Road from Denton Tap to Freeport Parkway, and Coppell Road from Bethel Road to Cooper Lane. The original contract was in the amount of $508,300.00. This project has since been broken into smaller pieces. The portion of Bethel Road between Penfolds Lane and Denton Tap was completed in January 2011. The portion between Freeport Parkway and Coppell Road/Mitchell is being constructed at this time as part of the Old Town project. Each of these changes required an amendment to the original design contract. All together there have been five previous amendments totaling $124,340.00. This proposed amendment will provide funding to finalize the design of the two remaining segments of this project. The two remaining segments are: Coppell Road from Bethel Road to Cooper Lane and Bethel Road from Coppell Road/Mitchell to Penfolds Lane. This amendment is needed to provide for additional surveying of developments that have occurred within the project area since the original survey was completed in 2003, and to cover any resulting design changes. This will also provide a design and environmental investigation for an extension of the gabion lined drainage channel that was built with a previous contract. This channel will be extended to the culvert under Coppell Road. Lastly this amendment will provide for wage adjustments to the engineer necessary due to the extended time period this contract has been in place. Approval of this contract amendment in the amount of $74,785.00 will allow us to move forward with finalizing the plans for these last two segments of Coppell Road and Bethel Road. Our intention is to move this project to construction shortly after completion of the Old Town project, which is expected during the fourth quarter of this year. Staff recommends approval of this amendment, and will be available to answer any questions at the Council meeting. ■ w 8 yY u ■ �` • - ara ws la s i • . �r . „ � � r - 0 V _ c i 1f — 1 ,..- r e W ❑ !C 1 21— . J W o 0 W > (1) cr a❑I- w 4. a 0 Q / Q �o ❑ MA CARTHOR BLVD f1. t < : ] J 3 z� f C) J w- CA •�UR �L� a z Q 0 W A ❑ ] a M ad 3e100N w a r a ��� w am F- ❑ �0 d W Q U Cl2! Zt21b3H t, I � 0 e a dwl NolN3a —, Z a� 3rsn 1138 ill, Z o S. '' � s. � — .. U (4 .. _ o .0.100w cP, CI8 11 d00 MK C] i Y ll3ddOC K �1% , E. Q '.IMNd .1� ..,, ift. . y Y ! Q Nl . 1V.' O f '! ' o - , _ 3 w 1 111 _ II . , ; ,v .* . I. .......- - -- Vr - — 1 PIP II I ' - — Illif '''''' . -rwa--,,,--./ I if r • $ j •,J'��� 4 ;`1 .. 1 1 w - ,r � fi �q «. n • r n t — +r e � 1 14, _ 1 . :it:1,', o . w f ❑ L'J 7 • W CI W U 7 re a .. Y �� ,i � LL U �, Q J ' U U , a � � d *N, �/ wr q .0;74 w • t L -, y .. 4 ; I AP En 0 o h w d �� I` f 'z f s0._.. " '` _ W ��yy �L g m :� I 4 ' 6 ` I LL j' I t ❑ d " "` _+ E 1 W Z N to q9 G ��y M r T, . a �l11s li3Ha 0 x.7,7 . ,1 ' ' - . r . . / U 0 ' ' I J �, 7 -e..i -,. , t _ H i + W :a• a .r N •1 - , O 1� O i. il W . F. — ,, �; { Z c e �! +� ,G ! i ar Duke '. ' , . F�- I t o H =— ,, r, ' . ........ . „ 0 -,-__- i t . .... li O O .. • . , • �. • r � s .Y .,ri L . — Rev. 06/10 FREESE CONTRACT CHANGE AUTHORIZATION FORM NICHOLS Amend #6 Client: City of Coppell FNI Project No.: CPL03243 255 Parkway Boulevard Client Contract Ref.: Original Contract P.O. box 9478 Signed May 28, 2003 Coppell, Texas 75019 Attn: Ken Griffin, P.E. Date: January 30, 2012 Project Description: Bethel Road Storm Water Services Description of Services and Deliverables Added /Deleted: See Attachment SC for Scope of Services and Deliverables details. Compensation shall be adjusted as follows: Basic Services (Lump Sum) Re- Survey $8,625 Gabion Channel Analysis $9,820 Gabion Channel Design $5,900 Re- Design due to Field Changes $18,765 Re- Submit Pre -Final Plans $9,170 Wage Adiustments $11,955 Basic Services Subtotal $64,235 Special Services (Hourly, not -to- exceed) Environmental $10,550 Special Services Subtotal $10,550 Total Additional Fee $74,785 Original Contract $508,300 Contract Amendment #1 $ 53,140 Contract Amendment #2 $ 38,400 .., Contract Amendment #3 $ 16,000 1 Contract Amendment #4 $ 14,800 0 Contract Amendment #5 $ 2,000 Current Amendment $74,785 ) Revised Total Contract $707,425 Schedule shall be adjusted as follows: No change to the current schedule. The above described services shall proceed upon return of this Contract Change Authorization. Services will be billed as they are done. All other provisions, terms, and conditions of the agreement for services which are not expressly amended shall remain in full force and effect. ® This Contract Change Authorization will serve as contract modification. FREESE A ICH INC.: CITY OF COPPELL: BY: 0114"--- BY: zy---,14.4 A 0. C C Q4 LIc j Jti W 11; ps T p Print or Type Name Print or Name TITLE: l Le Pt cs,:ci.rnA TITLE: ■ — h i Vi ages' l DATE: 2' 2- C2_ DATE: 3/5 /.2- 0 l Z 1701 N MARKET STREET, SUITE 500 LB 51 1 DALLAS, TEXAS 75202 -2001 TELEPHONE: 214-217 -2200 1 FAX: 214- 217 -2201 , . m......- .,...,r....•....-• 01... cw....11 ,r........,nro, 0/1.11, e.•w.1 0.11 w......... NA c•..-.., w..... c..... n1 .1n 1.1,101 .._._, re w ..... ' "' • • • FREESE COPPELL ATTACHMENT SC fill _NICHOLS ' CITY OF COPPELL TASK DESCRIPTIONS — SCOPE OF SERVICES Basic Services (Lump Sum) A. Re -Survey - 58,625 1. Field Surveys - Survey and prepare a revised design/topographic survey map to include three (3) newly improved intersections of Coppell Road North. Survey will also include upstream culvert on Coppell Road to previously constructed Gabion structures (approx. 200 ft) and downstream of culvert (approx. 50 ft). The design/topographic survey will indicate all surface features, spot elevations, one -foot contours, existing right -of -way lines, and utilities. B. Gabion Channel Analysis - 59,820 1. The existing conditions hydraulic model shows the gabion walls stopping approximately 400 feet upstream of Bethel Road. This model will be updated to reflect current conditions based on the new survey for the channel and Coppell Road. Proposed conditions will represent the channel improvements needed to provide the adequate level of protection to Coppell Road. The discharge estimates made by FNI in May 2008 will be used in the hydraulic models. No modifications to the hydrology are part of this scope of work. C. Gabion Channel Design - 55,900 1. Prepare Channel Design including; Channel Layout, channel widths, erosion control measures for approximately 200 LF of channel. D. Re- Design due to Field Changes - $18,765 1. Incorporate Design changes due to: a. City ROW negotiations (5 sheets) b. Other projects/ Project Sequencing 1. South Coppell Road (FNI) (4 sheets) 2. Old Town Coppell Development (9 sheets) 3. South Coppell Road (Huitt Zollars) (3 sheets) c. Anticipated Design changes due to field changes i. New driveway locations (5 sheets) ii. New waterline connections (5 sheets) iii. Changed drainage patterns/ features (3 sheets) iv. New Development (2 sheets) d. Total Sheets Affected = 21 sheets Exhibit "A" Page 1 of 3 E. Re- Submit Pre -Final Plans - $9,170 i. Prepare and Update Cost Estimate for Submittal ii. Update specifications iii. Constructability review for Submittal iv. Package plan set for Submittal F. Wage Adjustments - $11,955 1. Original Contract Remaining a. Average of 4.75% increase since 2003 for remaining unbilled - $16,482 i. Current Value = $26,125 ii. 2003 Value = $16,482 iii. Fee increase = $ 9,643 2. Contract Amendment #3 — Split Plans a. Average of 4.75% increase since 2007 for remaining unbilled - $ 7,200 i. Current Value = $ 9,511 ii. 2007 Value = $ 7,200 iii. Fee increase request = $ 2,312 Special Services (Hourly Not -to- Exceed) The following services are considered special services in addition to the Basic Services that are provided in the tasks above. A. Environmental - $10,550 1. Compile Information a. FNI will assemble data such as aerial photos, ROW limits, and project limits in digital format for site visit and create a data dictionary for the GPS data logger for data collection. 2. Site Visit a. FNI environmental scientists will conduct a site visit to observe and document existing conditions (environment) and assess project impacts along the proposed ROW. The presence and locations of waters of the U.S., including wetlands; potential threatened/endangered species habitat; and vegetation cover types will be identified in the proposed ROW. FNI scientists will also delineate approximately 300 linear feet of a tributary to Grapevine Creek by collecting GPS points along the ordinary high water mark (OHWM). 3. Consult with Texas Historical Commission (THC) a. FNI will consult the Texas Historical Commission, in writing, for a review of the proposed project regarding potential impacts to cultural resources. Consultation will only consist of a coordination letter. Any follow up studies required by the THC are not included in this scope of services. Exhibit "A" Page 2 of 3 4. Meet with City a. FNI environmental scientists will attend up to two meetings with the City to discuss the draft report, the City's comments, and the USACE permitting process. Additional Services - Freese and Nichols will notify the City if any of the following services will be necessary to comply with permit requirements. The following services can be provided upon written authorization by the City. 1. Preparation of a detailed wetland delineation and jurisdictional determination report. 2. Preparation of a pre - construction notification for nationwide or regional general 404 permit coverage. 3. Preparation of a formal written request for USACE authorization under a letter of permission procedure. 4. Preparation of a standard individual Section 404 permit application. 5. Preparation of Environmental Information Document, Environmental Assessment, or an Environmental Impact Statement. 6. Meetings or consultation with the USACE or other resource agencies, except as specifically noted in the scope of services. 7. If required by the USACE, FNI can assist the City with holding a Public Hearing by preparing public notices, submitting notices to local newspaper(s); providing verbatim transcript services, attending the public hearing; and incorporating the hearing record into the EA. 8. Presence /absence surveys for federally listed threatened/endangered species. 9. Preparation of a mitigation plan to compensate for impacts to waters of the U.S. 10. Application to Texas Commission on Environmental Quality for individual 401 Water Quality Certification. 11. Application for General Land Office easements. 12. Application for Texas Parks & Wildlife Department Sand and Gravel Permit. 13. Additional field investigations or analysis required to respond to public or regulatory agency comments. 14. Consultation with the U. S. Fish and Wildlife Service under Section 7 of the Endangered Species act. 15. Expert representation at legal proceedings or at contested hearings. 16. Mitigation monitoring if required by permit conditions. 17. Monitoring for compliance with permit conditions. 18. Additional modifications to the compensatory mitigation plan. 19. Assist with the payment of an EID processing fee if levied by the USACE. 20. Phase I Environmental Site Assessment. Exhibit "A" Page 3 of 3