Loading...
NL Cypress-CS120228 Page 1 of 2 George Marshall - RE: Northlake - Cypress Waters - Saintsbury From:   <brad.moss@kimley-horn.com> To:   <gmarshall@coppelltx.gov> Date:   2/28/2012 6:57 PM Subject:   RE: Northlake - Cypress Waters - Saintsbury CC:<ASAMANIEGO@coppelltx.gov>, <kevin.hoppers@kimley-horn.com>,     <jonathon.s... Attachments:   ExhibitNEW .pdf   George- Attached is our revised Traffic Signal Pole exhibit to reflect your comments and some of your suggestions.  The deepening of the foundation base to go under the shallow utilities has not been studied yet structurally, but I think that might be the better solution to avoid conflicts.  Please review the exhibit and call me if you have any questions.  We can get started on the structural design verification for the pole foundations and then provide you with a final plan. Thanks! ® Bradley Moss, PE , LEED AP (TX, OK, NC)   12700 Park Central Drive Dallas, Texas  75251 Ph: 972-770-1300  Fax: 972-239-3820 brad.moss@kimley-horn.com   From: George Marshall [mailto:gmarshall@coppelltx.gov] Sent: Thursday, February 23, 2012 3:47 PM To: Moss, Brad Cc: Albert Samaniego Subject: Northlake - Cypress Waters - Saintsbury   Brad,   I took a quick look at the foundation plan.  There seemed to be some missing info like type & size of conduits.  What type of conduit do you expect the contractor to install over the existing?  Will they fill this void between the outside of the ex conduit to the inside of the new conduit?  Lack of dimensions.  How about showing the other conduits in relation to the cube?  are there any beneath and if so, how much clearance?  What is the WL?  If it means a water line then wouldn't it be too shallow? file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4F4D2386City_of...3/8/2012 Page 2 of 2   Also, you can probably fit all three foundations on one sheet.   Thank You, George     George Marshall, PE City of Coppell Engineering 972-304-3562 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4F4D2386City_of...3/8/2012 CONC. POLE BASE 2-4" VERIZON PVC PIPE TOP=515.8± 1" AT&T PVC PIPE EX GROUND 6'-0" 1" VERIZON PVC 4" PIPE 2-4" VERIZON PVC P-2 PIPE 15" SANITARY SEWER VERTICAL BARS & SPIRAL AS SHOWN FOR FDN. TYPE 36 TOP=511.7± (MODIFY FOR 6' FOUNDATION DEPTH) P-2 P-3 6' x 6' x 6' FOUNDATION CITY 12" CONC. POLE BASE WATER MAIN 1/2" FIBER CABLE TOP=520.3± 1 1/2" IRRIGATION PIPE 2-4" AT&T PVC TOP=520.1± P-1 TOP=517.4± 6'-0" EX GROUND 2-4" AT&T 4" PVC PIPE 2-4" AT&T PVC PIPE 1 1/2" IRRIGATION PIPE 4" AT&T STEEL PIPE TOP=516.2± VERTICAL BARS & SPIRAL AS SHOWN FOR FDN. TYPE 36 10 1 1/2" AT&T 12" CITY WATER LINE (MODIFY FOR 6' FOUNDATION DEPTH) ABOVENET CABLE TOP= 512.2± 1/2" FIBER CABLES TOP=516.5± (COMPANY P-1 CONC. POLE BASE UNKNOWN) 6' x 6' x 6' FOUNDATION 1/2" FIBER CABLE 10-1 1/2" AT&T & TOP=518.6± 1 1/2" IRRIGATION PIPE 2-4" PVC AT&T ABOVENET PVC PIPE TOP=519.0± TOP=517.5± 6'-0" EX GROUND 4" AT&T STEEL PIPE 4" P-4 P-5 4" AT&T 10 1 1/2" AT&T VERTICAL BARS & SPIRAL AS SHOWN FOR FDN. TYPE 36 STEEL PIPE ABOVENET CABLE (MODIFY FOR 6' FOUNDATION DEPTH) TOP=516.0± TOP=516.0± NOTES: P-5 1)UTILITY INFORMATION SHOWN IS BASED ON MARIO SINACOLA FIELD SURVEY DATED 02/14/2012, INFORMATION FROM SUBCONTRACTOR 6' x 6' x 6' FOUNDATION DATED 02/28/2012, AND RECORD DRAWINGS. 2)CONTRACTOR TO FIELD VERIFY HORIZONTAL AND VERTICAL UTILITY LOCATIONS PRIOR TO PROCEEDING WITH CONSTRUCTION. 3)CONTRACTOR TO COORDINATE FOUNDATION CONSTRUCTION WITH FRANCHISE UTILITY OWNERS, AND PROVIDE A CONDUIT SLEEVE 1 1 TIMES THE SIZE OF THE EXISTING PIPE/CABLE. THE SLEEVE SHALL BE PVC 2 PIPE WITH EMPTY VOID SPACE BETWEEN OUTER EDGE OF UTILITY AND INNER EDGE OF PVC SLEEVE. EX