ST8503-CS 880615 ED BELl CONSTRUCTION COMPANY POST OFFICE BOX 540787 10215 GARDNER ROAD DALLAS. TEXAS 75354'0787 Ginn, Inc. .~. ,,.~.~,~ 17103 Preston Rd. Suite 100 Dallas, Texas 75248 RE: Certificate of Substantial Completion Bethel School Road - Coppell Our Project 796 Dear Sir: Enclosed please find six (6) signed copies of the Certificate of Substantial Completion for subject project. We are returning these certificates to you for further execution. If you have any questions, please advise. Very truly yours, ED BELL CONSTRUCTION COMPANY H. W. Baker Vice-President Encl. GINN, INC. ( {)NSIII TING I, N( INEEliS June 7, 1988 Ed Bell Construction Co., Inc. Post Office Box 540787 10215 Gardner Road Dallas, Texas 75354-0787 Attn: Mr. Bud Baker RE: Bethel School Road Project Coppell, Texas Certificate of Substantial Completion Dear Sir: The work to which this Certificate applies has been inspected by authorized representatives of the Engineer, and that work is hereby declared to be substantially complete in accordance with the Contract Documents as of June 2, 1988. A tentative list of items to be completed or corrected is attached hereto. This list was prepared based upon a preliminary walk-thru made by our project inspector and Mike Robbins of Ed Bell Construction Co., Inc. on May 25, 1988. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of the Contractor to complete all the work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by the Contractor prior to requesting a final walk-thru on the project. This certificate does not constitute an acceptance of work not in accordance with the Contract Documents nor is it a release of Contractor's obligation to complete the work in accordance with the Contract Documents. Executed by Engineer on ~~ ~ ,1988. Ginn, Inc. Consulting Engineers 17103 I'~cston Road · St,itc 100 · !~!~ 11[1 · l)allas, Tcxlts 7524g · Phone 214/24g-4900 Contractor accepts this Certificate of Substantial Completion on · ,._/~ /~J' ,1988. Ed Bell Construction Co., Inc. Owner accepts this Certificate of Substantial Completion on /~/ , 1988. City of Coppell, Texas city Eng~eer Please sign and return all copies to us for further execution and distribution. After execution of this document by the owner, we will return a copy to you. Should you have any questions, please contact us. Sincerely, Gabe Favre Project Manager GF/dp Enclosure: Tentative list cc: Alan Ratliff, City Manager Mayor and Council Wayne Ginn Butch Ellison File 257