Loading...
ST8503-CS 880510LoCATIO" CO1'~~-i''' ' "TX. PRO.,E~TNO. ¢2/¢;'7 DATE r~--I ~-~>~ ¢'~.~, CROSS REFERENCE TO cONTRACTOR [--~t--~ F~I?L-L ,"o ('q · - OA,L~ REPORT NO. INSTRUCTIONS Whenever any corrective change i$ made in field construction which is at variance with the specifications and drawings as originally issued. a complete detailed report shall be filed, listing the follow~ng items, so that s~ecifications or drawings storage data can be corrected. 1. Identify the problem: Indicate why originally specified construction was not used. 2. The Solution: Describe, in detail, the recommended change or changes that were made, as applicable. 3. Indicate whether this is a~ isolated case or a general condition which could be improved by changing future specifications or drawings. 4. Submit sketches as necer~ar~/. SPEOFICAT~ON SECTtON No. ~JA PAaE No. PARAgrAPH No. ENTITLED L//!CJ~ J IxJA("D~-:i~., J ~'il.)l)(~v(-i\I(' DRAW,NO No l ~' '~ DESCRIPTION ¢,Z¥~' ":;'~'V~/' ('O'(._?_I"'J(::'[Z- I, DETAILED IDENTIFICATION OF THE PROBLEM - · .,AN[.,) ~OC~',-/ .'~_T2/JFJdll (._N, ',-- ~¥'TF:'A 'I~iE-T~.~~. '~%ul?V(~-/ t -1"t-tt17 OV('/.~L/~/V/') -F-/r)~d/ dOU/L ~j) ~I/DT' (-)('(~.x/z. ,4/vz) 2. DETAILED SOLUTION PROPOSED OR ACCOMPLISHED ~'~ ¥"' ]")C') '(T~) -I~ .J?-"'~ ~ C~"T" j '"'2..-'' ~).. (-~-.~'-~ 4. SUBMIT SKETCHES AS NECESSARY BY .' TELLPttONI- I:/141 ~B 14,1~ POST OFFICE BOX 540787 10215 GARDNER ROAD DALLAS, TEXAS 753§4-0787 May 5, 1988 Mr. Gabe Favre Ginn, Inc. 17103 Preston Rd. suite 100 Dallas, Texas 75248 RE: Field Change No. 11 Proposed Change Order - 12" RCP Storm Drain Bethel School Rd. - Coppell Our Project #796 Dear Sir: We propose to furnish and install approximately 45 LF of 12" Cl III RCP Storm Drain at about station 19+60 on subject project for the following unit prices: 12" CL Iii RCP Storm Drain $ 25.00/LF Excavate & pour pipe collars and excavate and break into existing inlet $1,035.00 LS Should you require additional information, please contact me. Very truly yours, ED BELL CONSTRUCTION COMPANY H. W. Baker Vice-President HWB/gh AN EQUAL OPPORTUNITY EMPLOYER