ST8503-CS 880224' "* REPORT O* FIELD CHANGE
SPECIAL REPORT NO.
CONTRACTOR ~ ~1 ~ ('"'(~/~*-*T ' (Q CROSS REFERENCE TO
.... ~ DAILY REPORT NO.
INSTRUCTIONS
Whenever any corrective chan~ is m~e in field construction ~ich is a~ variance wi~h the specifications and drawings as originally issued,
a complete ~tailed report shall ~ filed, lis~ing the following items. ~ that ~ifications or drawings stora~ da~a can ~ corr~ted. 1. Identify the problem: Indicate why originally sp~ified construction was not used.
2. The Solution: O~cri~, in detail, the r~ommended chan~ or chants that ~re m~e. as applicable.
3. Indicate whether this is an isolated case or a ~neral condition which could ~ improved by changing future specifications or drawing.
4. Submit ske~ch~ as n~e~.
REFERENCE DATA ~0~ A~Ct~ 0
SPECIFICATION SECTION No. PAGE No. PARAGRAPH No.
DRAWING No. EhTITLED
SKETCH No. DATED ENTITLED
DESCRIPTION
1. DETAILED IDENTIFICATION OF THE PROBLEM
2. DETAILED SOLUTION PROPOSED OR ACCOMPLISHED
3. IS THE PROBLEM AN ISOLATED CASE OR GENERAL?
4. SUBMIT SKETCHES AS NECESSARY
,0590
TELEPHONE (2141 556.1475
POST OFFICE BOX 540787 10215 GARDNER ROAD
DALLAS TEXAS 75354'0787
.j ~ ~ f~'
February 18 1988 ''-' I 9/~ ~i'
Mr. Gabe Favre ~"
Ginn, Inc.
17103 Preston Road ·
Suite 100
Dallas, Texas 75248
Re: Surface Drains
Bethel School Road - Coppell
Our Project 796
Dear Sir:
As P~r.~our representative,s request, we are pleased to submit
the o&£owing proposed price for connecting the surface drains
from private property to the project storm drainage system.
1. To connect through the curb
to the pavement - $300.00 per each.
2. To connect to the storm drain
underground pipe system - $500.00 per each.
The above prices include all labor, equipment and materials to
do the work described.
Very truly yours,
ED BELL CONSTRUCTION COMPANY
H. W. Baker
Vice President
HWB:nw