Loading...
ST8503-CS 871009 REPORT OF FIELD CHANGE SPECIAL REPORT NO. PROJECT 1~ ~'T~4~-:L FJ'?qlt 00/~" ~'2~)' PAGE LOF LOCATION C(.-,~[~'~' L..L PROJECT"O. ¢1~-1 DATE I~)- Cf. 87 CONTRACTOR ~-.~ ~)'E'~?'L.L- ~_~)~}5>~'. ("~3 , CROSS REFERENCE TO DA~L~ .E.ORT NO. INSTRUCTIONS Whe~evl~ any cerr~ti~ chan~ is m~e in field construction ~ich is at variance with the sp~ifications and drawln~ as originally a complete ~tai~d ~rt shall ~ fil~, listing the followi~ items. ~ that ~ifi~tions or drawings st~a~ data can ~ coffered. 1. I~ntify the probit: Indicate ~y originally sp~ified construction ~s not 2. The Solution: D~cri~, in detail, the r~ommen~d chan~ or chan~ that ~e m~e, as applicable. 3. Indicate ~ether thil is a~ isolated ~ or a ~neral condition ~ich could ~ improved ~y changing f~ture sp~ifications or drawing. 4. Submit s~ch~ ~ n~. I REFERENCE DATA ~]~l(~ ~6m:]T4~ Io.¢-~q ~ ~lt Eo~ .~, SPECIFICATION SECTION No. PAGE No. PARAGRAPH No. DRAWING No. ENTITLED SKETCH No., DATED ENTITLED DESCmPTIO. 1. DETAILED IDENTIFICATION OF THE PROBL ~[T~/ [~ff ~g E' ~¢ ~ ~/:~T~ VALVC~ ~ IN~TALL6-D ~N ~~ L~iz 2. DETAILED SOLUTION PROPOSED OR ACCOMPLISHED .._~ (I1A VALV e 4. SUBMIT SKETCHES AS NECESSARY GINN, INC. CONSULTING ENGINEERS October 14, 1987 Mr. Steve Goram City of Coppell P.O. Box 478 Coppe11, TX 75019 Re: Bethel School Road Improvements Dear Mr. Goram: As per the verbal request of Carl Bass, w~ are directing the contractor to install two gate valves and a fire h drant on the above referen . .Y _ assembly ........ ced project. The approximate ~~ .... ~ ~v~s are as ~ollows: ..... ~v~ anu I - 8" Gate Valve $ 575.00 .. i - FAre Hydrant Assembly $1897.50 (8" x 6" Tee, 6" Valve, F.H.) 1 - 8" Gate Valve $ 575.00 Additionally, the water line on Greenridge Drive was found to be 12" diameter, not 6" as indicated on the plans. This line has to be lowered. The contractor has given us a price of $92/LF for lowering. The net cost is as follows: Deduct: 20 LF - 6" lowering (pay item 582.6) x $46.80 = $936.00 Add: 20 LF - 12" lowering x $92/LF = $1840.00 Net Cost (Add) $904.00 17103 Pr_es~.qn._R_o~l_._~_.l~.'.te 100 · LB 118 · Dallas, Texa~_7._5_24_8_~ _~ho.n_e 214/2484900 ~he total cost for these additions will amount to approximately $3951.50 added to the contract. Should you have any questions, please contact us. C0~~ Sincerely, ~Favre GF/dsp cc: H. Wayne Ginn Alan D. Ratliff Ronnie Bates Butch Ellison Frank Trando