Loading...
ST8503-CS 870810 GINN, INC. CONSULTING ENGINEERS August 10, 1987 Ed Bell Construction Company Post Office×Box 20777 Dallas, ~xas 75220-0777 ~ Attention: Tom Bethune, Jr., P.E. Re: Bethel School Road Improvements Coppell, Texas Gentlemen: A preconstruction meeting was held on Monday, August 10, 1987 at 10:00 a.m., and the following items were mentioned or discussed. 1. Owner is City of Coppell. Engineer is Ginn, Inc., whose duty is to administer project, make observations, review shop drawings, etc. Contact person is Gabe Favre. Ed Bell contact person will be Mike Robbins in the field and Bud Baker or Tom Bethune in the office. 2. Notice to proceed on or before September 1, 1987...300 calendar day project...Completion date is June 26, 1988. 3. All communication will be through Ginn, Inc. 4. Change Orders. 5. Contractor to provide: *Construction Sequence *Construction Schedule *Cash Flow Schedule 6. Utility company conflicts. 7. Material storage area. 8. Contractor shall comply with all safety practices and codes. 9. Payment of concrete when reaches 3000 psi. 10. Concrete design mix. 11. Plans/specs availability. CQ~~ 17103 Preston Road · Suite 100 · LB II8 · Dallas, Texas 75248 · Phone 214/248-4900 12. Testing. 13. Substitutions. 14. Bid items, basis for payment. 15. Insurance effective date until 10/31/87. 16. Alternates. 17. Special conditions: *Appendix C, definition of terms. *Bench marks, control points. *Copies of field notes. *Documentation of delays. *Partial payments. *Existing structures and utilities. *Sequence of construction. *Barricades and signs. *Precast inlets. *Right-of-way establishment. *Flagging of trees for removal. *Work hours. *Sprinkler system. 18. Special Provisions *Before/after cross-sections. *Borrow source. *Sodding. *Concrete design mix. *Box culvert. *Field office. *Stone facing. 19. Plans *Saw and remove limits. *Relocated gas line. *Sidewalk location. *Shop drawings. *Decorative fence. 20. General *Sensitive to homeowners. *Contact homeowners. *City operates valves. ¢eP¥ -3- The above items enumerated are noted and concurred with, but understood not to be a modification of any existing contracts or agreements. Please return one signed copy for our files. Should you have any questions, please contact us. Sincerely, Gabe Favre CONCURRENCE: /jc Ed Bell Construction Co. cc: Alan Ratliff Wayne Ginn By: Steve Gora~ Butch Ellison Title: Ronnie Bates Date: P.NIN/257 .....