From: Michael Garza
To:Rhonda Adloo
Date: 3/12/2012 9:57 AM
Subject: Fwd: RE: ADA ramp delay
Attachments:Scan20120310_0004.pdf
Can you put this in the red hawk file.
thanks,
Mike
>>> On 3/10/2012 at 3:23 PM, in message <015001ccff04$02ac4c60$0804e520$@theholmesbuilders.com>,
"Terry Holmes" <terry@theholmesbuilders.com> wrote:
Mike- Cambridge has 20 lots under contract. Only one of those, 23/A is contracted to them. I will copy
them on this, so they are not mislead or unaware. Thanks.
Working Together,
Terry Holmes
The Holmes Builders
225 E. Hwy 121, St 120
Coppell, Texas 75019
o. 214.488.5200 x205
c. 469.446.1165
f. 214.488.5255
From: Michael Garza [mailto:mgarza@coppelltx.gov]
Sent: Friday, March 09, 2012 2:26 PM
To: David Hayes; Terry Holmes
Cc: Rhonda Adloo
Subject: ADA ramp delay
Terry,
I am ok with you postponing the ramps to be built at the time of the home construction. However, it is my
understanding that Cambridge owns several lots, are these lots that are adjacent to the ramps belong to
Holmes builders or Cambridge? The ramps should be built within the 2-year maintenance bond time
period.
If you have any questions please contact me at your convenience.
thanks,
Mike