Loading...
Red Hawk-CS120312 Page 1 of 1 Rhonda Adloo - Fwd: RE: ADA ramp delay From:   Michael Garza     To:Rhonda Adloo Date:   3/12/2012 9:57 AM Subject:   Fwd: RE: ADA ramp delay     Attachments:Scan20120310_0004.pdf   Can you put this in the red hawk file.   thanks, Mike >>> On 3/10/2012 at 3:23 PM, in message <015001ccff04$02ac4c60$0804e520$@theholmesbuilders.com>, "Terry Holmes" <terry@theholmesbuilders.com> wrote: Mike- Cambridge has 20 lots under contract. Only one of those, 23/A is contracted to them. I will copy them on this, so they are not mislead or unaware. Thanks.       Working Together, Terry Holmes The Holmes Builders 225 E. Hwy 121, St 120 Coppell, Texas 75019 o. 214.488.5200 x205 c. 469.446.1165 f. 214.488.5255   From: Michael Garza [mailto:mgarza@coppelltx.gov] Sent: Friday, March 09, 2012 2:26 PM To: David Hayes; Terry Holmes Cc: Rhonda Adloo Subject: ADA ramp delay   Terry, I am ok with you postponing the ramps to be built at the time of the home construction. However, it is my understanding that Cambridge owns several lots, are these lots that are adjacent to the ramps belong to Holmes builders or Cambridge?  The ramps should be built within the 2-year maintenance bond time period.    If you have any questions please contact me at your convenience. thanks, Mike        file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4F5DC872City_...3/12/2012