Loading...
ST8503-CS 870409 P.O. Box 478 Coppell, Texas 75019 ~ The City With A Beautiful Future 214- 462- 0022 April 9, 1987 Mr. Gabe Favre Ginn, Inc. 17103 Preston Road Suite 100, LB 118 Dallas, Texas 75248 RE: Bethel School Road Improvements Heartz Road to Moore Road Dear Gabe: I received the construction plans on the above project on March 26, 1987. Since the referenced project had not been placed on the Development Review Committee agenda, I assumed the forwarded final construction plans were just for our Engineering files. Please accept my apologies for responding to your request at this time. I reviewed your plans, and in my opinion it is a job well done. I would like to make the following comments: 1) Please delineate the storm sewer systems on the Drainage Area Map. 2) Please show the hydraulic calculations, Q100, C, V, S .... on the Storm Sewer Profiles at joctions and where pipe sizes change. To avoid any delay on my part, in the future, please provide me with preliminary construction plans on any project which you may feel my comments and review are required. Shohre Daneshmand Civil Engineer cc: Frank Trando Wayne Ginn SD/lsg