Loading...
NL Cypress-CS120326 T H E C 1 T Y O F COPPELL * 0,0-g S 1 S March 26, 2012 Brad Moss Kimley -Horn and Associates, Inc 12700 Park Central Drive Suite 1800 Dallas, TX 75251 RE: Northlake- Cypress Waters Fee Assessment Letter Enclosed is a copy of the Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the water meter and inspections in the amount of $9,070.75 at the time of pickup of the water meter. Water meters are picked up at the Public Works Service Center, 816 S. Coppell Road. The meter has already been ordered and we will notify the contractor when it is available. The City continues to work with the City of Dallas on the Supplemental Water Agreement. Until that agreement is approved by both Cities, no connection from the water meter to the Dallas side water line will be allowed. The City is also discussing whether or not wastewater Impact Fees should be assessed. If assessed, an additional $35,010.00 will also be required before connection to the Dallas side water line. Sincerely, George Marshall, P.E. Civil Engineer Office Phone: (972) 304 -3562 Fax: (972) 304 -3570 gmarshaWcoppelltx.gov cc: Jennifer Miller, Finance Director Amy Swaim, Administrative Technician, Building Inspections Glenn Hollowell, Assistant Director of Public Works Tim Oates, Deputy Chief /Prevention Brad Reid, Director of Parks and Recreation Michael Arellano, Chief Building Official A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV DEVELOPMENT FEE TABLE Project: Northlake- Cypress Waters Water & Sewer Tie -in Date: 3/8/2012 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $0.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $8,940.75 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $35,010.00 1 (100% due at Issuance of Building Permit) ** see letter dated March 26, 2012 Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $0.00 $0.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) 11 Street Sign Fee Information not Available (100% due prior to Acceptance of Project) 11 Construction Inspection Fee Information not Available (100% due prior to Start of Construction) 11 TOTAL $44,080.75 I TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: Northlake- Cypress Waters Water & Sewer Tie -in DATE: 3/8/2012 Water Impact Fee: Domestic Meter(s): 1 - 8 inch = 80 ESU's Irrigation Meter(s): 0 = 0 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total #: 0 ESU's @ $900.00 ea. $0.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $8,940.75 $8,940.75 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Fireline Meter(s) @ $0.00 meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. $0.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: 1.68 MGD =1167 gpm /(30gpm /ESU) Total Domestic Meters ESU's: 38.9 @ $900.00 ea. $35,010.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 0 Single- family @ $0.00 per lot $0.00 0 Multi- family @ $0.00 per unit $0.00 (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $0.00 Street Lighting Fees: Assessed for lighting in the City's right -of -way. Information not Available This fee cannot be assessed until after Oncor submits the lighting plan for the proposed development. Once the plans are submitted, $352.44 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right -of -way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2