ST8402-CS 881108 (3) GINN, INC.
November 8, 1988
Mr. Joe Pilazzo
Conoco, Inc.
3519 Patrick Street
Lake Charles, LA 70605
CO N S I 1 N E E IlS
Re: Denton Tap Road Improvements, City of Coppell, Texas.
Dear Mr. Pilazzo:
I am transmitting herewith a fully executed agreement between
Conoco, Inc., L. H. Lacy Co. and the City of Coppell, concerning
the crossing of the Con-Dor 6" high pressure petroleum products
line by the improvements to Denton Tap Road. I have also
enclosed two blue line prints of a plan and profile drawing
showing the horizontal and vertical relationships between the
proposed road improvements and your facilities. Please note the
location of the City of Coppell's existing 8" water line which
crosses your pipeline and take the necessary steps to instruct
your contractor to avoid damaging the water line during his
construction work in the area.
As per our telephone conversation of Monday, November 1, 1988, a
meeting was held between L. H. Lacy Co. (the Contractor for the
Denton Tap Road Improvements), Ginn, Inc., and the Cotton Belt
Railroad for the purpose of coordinating work in this area. I
have enclosed a copy of the minutes of this meeting for your use
in acquainting you with the status some of the other work which
will be in progress at the time your forces will probably be
accomplishing their work. As you can see by the proposed time
frames for the various items of work in this area, it is
important for Conoco to begin its work as soon as possible.
Please contact me as soon as you have established your schedule
for the improvements to your facilities so that we can coordinate
your efforts with the city of Coppell's Contractor.
Sincerely, ~
John C. Karlsruher,
Project Engineer
PoE,
Enclosure
cc: H. Wayne Ginn, P.E.
Russell Doyle, P.E. - City Engineer
David M. Snyder, P.E. - L. H. Lacy Company
Randy Fleming