Loading...
ST8402-CS 881108 (3) GINN, INC. November 8, 1988 Mr. Joe Pilazzo Conoco, Inc. 3519 Patrick Street Lake Charles, LA 70605 CO N S I 1 N E E IlS Re: Denton Tap Road Improvements, City of Coppell, Texas. Dear Mr. Pilazzo: I am transmitting herewith a fully executed agreement between Conoco, Inc., L. H. Lacy Co. and the City of Coppell, concerning the crossing of the Con-Dor 6" high pressure petroleum products line by the improvements to Denton Tap Road. I have also enclosed two blue line prints of a plan and profile drawing showing the horizontal and vertical relationships between the proposed road improvements and your facilities. Please note the location of the City of Coppell's existing 8" water line which crosses your pipeline and take the necessary steps to instruct your contractor to avoid damaging the water line during his construction work in the area. As per our telephone conversation of Monday, November 1, 1988, a meeting was held between L. H. Lacy Co. (the Contractor for the Denton Tap Road Improvements), Ginn, Inc., and the Cotton Belt Railroad for the purpose of coordinating work in this area. I have enclosed a copy of the minutes of this meeting for your use in acquainting you with the status some of the other work which will be in progress at the time your forces will probably be accomplishing their work. As you can see by the proposed time frames for the various items of work in this area, it is important for Conoco to begin its work as soon as possible. Please contact me as soon as you have established your schedule for the improvements to your facilities so that we can coordinate your efforts with the city of Coppell's Contractor. Sincerely, ~ John C. Karlsruher, Project Engineer PoE, Enclosure cc: H. Wayne Ginn, P.E. Russell Doyle, P.E. - City Engineer David M. Snyder, P.E. - L. H. Lacy Company Randy Fleming 17103 Prcstoss Road ® Suite 100 · LB IIg · I)allas, Tcxas 75248 · I'htmc 214/2414-4900