Loading...
ST8402-CS 881107The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 FILE COPY November 7, 1988 Mr. Jerry Parche Parche Consulting Engineers 6001W. Interstate 20 Suite #209, LB 32 Arlington, Texas 76016 RE: JP No. 88009: Median Openings - Denton Tap Road, Coppell, Tezas Dear Mr. Parche: I am in receipt of your letter of November 3, 1988, regarding the subject topic. I appreciate your efforts to integrate your development requirements into the City Public Improvements, saving money and items covered in the last paragraph of your letter. I immediately called Wayne Ginn, and he informed me that John Karlsruher was looking at your letter. I have forwarded your letter to Ginn, Inc., the Project Manager for the City, as well as the City Plan Reviewer. I will seek the information you requested, and provide to you, as outlined below, but cannot ~uarantee the November 15, 1988, deadline you have presented to this office. I hope that the recent advice you received will not delay you any further than you have been in the past. (I recall Kevin Peiffer advising you of the requirements for this request in a DRC meeting many weeks ago). I concur that a median opening can be approved if the owners on both sides of the thoroughfare (and along the roadway on both sides, for an appropriate distance) approve the location, etc. Traffic EngineerinG DesiGn and City Codes must be considered; and the funding and construction coordination must be worked out. Also, you, the initiator, must bear the burden of providing what is needed to make this work. Regarding your October 7, 1988 letter to Ginn, Inc., if you can not get the agreement on the south cuts, perhaps we could still get construction joints in position, so as to not require saw cuttinG, etc. You have obviously gotten some answers to this letter, since you cite the December, 1988 paving start. Let me address your items, as numbered in the November 3, 1988 letter: 1) I can not necessarily authorize Ginn, Inc. to include the cuts north of Parkway Boulevard, until we get information needed and funding commitments made; then we can determine whether staff can authorize the work, or if it is necessary to seek City Council approval, etc. 2) I have requested the project engineers to respond to this request regarding resources need and when the funding obligation can be determined. 3) ABQ Development financial obligations regarding this request must be assured before change orders can be issued and/or work orders given. Please seek Frank Trando's, City of Coppell Finance Director, advise and consent on various options available, so that he can approve the expenditure of funds when needed, etc. Please provide me with the development plans (plan views, etc.) that are approved or proposed to be approved by the City of Coppell, that will be serviced by these median cuts. Your drawings no doubt serve for the engineering and construction purposes, but I need to know the planning established related to these median cuts, and you need to furnish them to me for review, verification or other considerations. We appreciate your efforts in initiating these efficiencies and cost savings, etc. Thank you. Jerry, why did Dr. Stanfield's office call me notifying me of the timing 9f~the F.E.M.A. approval process? RRD/lsg xc: Jay Chester, ABQ Development Wayne Ginn, Ginn, Inc. Shohre Daneshmand, Civil Engineer MEDOPENS.PAR