Loading...
ST8402-CS 881012 GINN, INC. October 12, 1988 CONSULTING ENGINEERS Mr. John H. ~aynes, P.E. John H. Haynes & Associates, Inc. 2424 Stutz Drive P.O. Box 35481 Dallas, Texas 75235 Re: Denton Tap Road Improvements, Coppell, Tx. Dear Mr. Haynes: I am enclosing a copy of a letter from L. H. Lacy Company which is requesting that Cement Stabilization be used for subgrade treatment in lieu of Lime Stabilization as specified in your geotechnical investigations and our design for the projects. If Cement Stabilization can be used on this project, there may be a considerable savings in both construction time and cost to the City of Coppell. I would like for you to review and evaluate L. H. Lacy Company's request. In our previous conversations regarding this subject you mentioned that in order to evaluate a request such as this, some information indicating the rates of application, thickness, and acceptance criteria should be included. In reading the attached letter it is not apparent what the acceptance criteria should be, but the rates of application and thickness proposed appear to be the same as that proposed for the Lime Stabilization. If you need the results of tests, such as Ph/PI, Proctors and etc. to evaluate this request, please respond accordingly. In order to justify his request the Contractor must pay for and provide us with any test data or design data which will adequately convince you that what they are proposing will result in a finished product equal to or better than that originally specified. Please call me if you have any questions. S ince~ely, J Pr~ect Engineer JCK/j k enclosures cc: H. Wayne Ginn, P.E. David M. Snyder, P.E. - L. H. Lacy Co. Randy Fleming 17103 Preston Road · Suitc 100 * IAI 118 ·Dallas, Tcxas 75248 · Phone 214/248-4900