Loading...
ST8402-CS 880907 GINN, INC. September 7, 1988 Mr. David M. Snyder, P.E. L.H. Lacy Company 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 Re: Denton Tap Road Impro-~em~ts from Sandy Lake Road to Denton Creek, Coppell, Texas. Dear Mr. Snyder: We have reviewed your proposals for proposed Change Orders number 1 and 2, and the August 30, 1988 revision of proposed Change Order number 1. After due consideration we have decided to postpone this work until a later date. We appreciate your efforts to bring the proposals forward in a timely manner. In our previous discussions, we entertained the possibility of installation of enough pipe crossing beneath the storm sewer line "D" to allow the work to proceed as scheduled and still provide for the connection of the 16" and 8" water line crossings requested by ABQ Development. This will be unnecessary and you are hereby notified not to install the abovementioned pipe crossings. If you have any questions or concerns regarding these items, please call me. Sincerely, Jo~' C. Karlsruher, P.E. Project Engineer enclosures cc: Russell Doyle~, H. Wayne Ginn Randy Fleming Gabe Favre File 379 J379COl& 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900