Loading...
ST8402-CS 880824 PROPOSED PROJECT BUDGET DENTON TAP ROAD IMPROVEMENTS FROM BELT LINE ROAD TO SANDY LAKE ROAD; AND FROM SANDY LAKE ROAD TO DENTON CREEK CONSTRUCTION (6 LANE w/St'd. Bridge Rail) RAILROAD CROSSING $ CONOCO PIPELINE $ STREET LIGHTS $ LANDSCAPING $ TRAFFIC SIGNALS $ RIGHT - OF - WAY $ ENGINEERING $ INSPECTION & TESTING $ TRENCH SAFETY $ CONTINGENCIES $ $ 5,161,131.83 * 206,000.00 40,000.00 217,500.00 213,000.00 170,000.00 100,000.00 443,402.66 154,833.95 26,763.39 367,368.17 * TOTAL $ 7,100,000.00 (-) TOTAL AVAILABLE CITY FUNDING ($ 4,500,000.00) (=) NECESSARY FUNDING FROM DALLAS COUNTY $ 2,600,000.00 TOTAL AVAILABLE DALLAS COUNTY '85 BOND FUNDS $ 4,250,000.00 (-) NECESSARY FUNDING FROM DALLAS COUNTY ($ 2,600,000.00) (=) REMAINING '85 DALLAS COUNTY BOND FUNDS $ 1,650,000.00 REVISED APRIL 6, 1988 * REVISED APRIL 18, 1988 The estimated construction costs have been revised to include the only TOTAL BASE BID (6 LANE) for each project. Initially this item also included the Contractor proposed $ 40,000.00 reduction in estimated Contract Price; the alternate bid item for a retaining wall (which is no longer needed); and the additional cost of the Contractor's proposed Alternate Trench Safety System. After further consideration, these costs have been deleted from Construction and added to the Contingencies.